Canford

Revision as of 12:30, 17 March 2021 by Bin52 (talk | contribs) (minor text change)
Artist Impression of Canford Gasifiaction Facility
Artist Impression of Canford Gasifiaction Facility


Error: no local variable "site" has been set.
Error: no local variable "status" has been set.
Site Location
Site Location

See Residual EfW → page for a larger UK Wide map.

Waste Licence Error: no local variable "epr" has been set.
Operator [[Error: no local variable "operator" has been set.]]
Region [[:Category:Error: no local variable "region" has been set.|Error: no local variable "region" has been set.]]
Operational Capacity Error: no local variable "cap" has been set.ktpa
Is site R1? Error: no local variable "r1" has been set.
When was R1 Granted? Error: no local variable "r1date" has been set.
What was the R1 value Error: no local variable "r1value" has been set.
Electrical Capacity Error: no local variable "mwe" has been set.MWe
Number of Lines Error: no local variable "line" has been set.
Number of Turbines Error: no local variable "turbine" has been set.
CHP Error: no local variable "chp" has been set.
Technology Approach Error: no local variable "techtype" has been set.
Funding Type [[Error: no local variable "funding" has been set.]]

Operators Annual Report


Input Data

Year HH C&I Clin RDF Total


Output Data

Year IBA IBA %ge of Tot IN APC APC %ge of Tot IN

Summary

An EfW facility based upon Gasification technology. Originally owned and developed by New Earth Solutions as part of a wider development at the Canford site in Dorset, it was granted planning consent in 2013 and was intended to be operational by 2015, generating 10MWe. The adjacent MBT plant is operational but no construction is understood to have progressed on the EfW facility.

Technology

The plant was designed based on the New Earth Solutions Technology or NEST that was utilized in Avonmouth but was mothballed after operational difficulties and with the business going into administration in 2016[1].

Construction

There is no information on the current status of funding or construction of the project in the public domain.

Waste Input

The plant was designed to run on 80,000 tonnes per annum of prepared RDF from the adjacent MBT facility[2].

References