Industrial Emissions Directive

Revision as of 14:10, 22 March 2021 by Admin (talk | contribs)

The objectives of The Industrial Emissions Directive (IED) are to “reduce emissions into air, soil, water and land and to prevent the generation of waste, in order to achieve a high level of protection of the environment as a "whole” by reducing harmful emissions across the EU, in particular through better application of Best Available Techniques (BAT)[1].

Operator’s combusting waste would need to comply with Chapter IV of the IED - Special Provisions for waste incineration plants and waste co-incineration plants'.

Directive 2010/75/EU is a recast of the Waste Incineration Directive (WID) alongside six other European Directives including the Integrated Pollution and Prevention (IPPC) Directive and the Large Combustion Plants Directive and is enacted via the Environmental Permitting Regulations 2010, as amended.

The IED is based on several pillars, in particular (1) an integrated approach, (2) use of best available techniques, (3) flexibility, (4) inspections and (5) public participation[1].

  1. The integrated approach means that the permits must take into account the whole environmental performance of the plant, covering e.g. emissions to air, water and land, generation of waste, use of raw materials, energy efficiency, noise, prevention of accidents, and restoration of the site upon closure.
  2. The permit conditions including emission limit values must be based on the Best Available Techniques (BAT) which are described within BAT Refernce Documents (BREFs) The IED requires that these BAT conclusions are the reference for setting permit conditions.
  3. The IED allows competent authorities some flexibility to set less strict emission limit values. This is possible only in specific cases where an assessment shows that achieving the emission levels associated with BAT described in the BAT conclusions would lead to disproportionately higher costs compared to the environmental benefits due to the geographical location or the local environmental conditions or the technical characteristics of the installation. The competent authority shall always document its justification for granting such derogations.
  4. The IED contains mandatory requirements on environmental inspections. Member States shall set up a system of environmental inspections and draw up inspection plans accordingly. The IED requires a site visit to take place at least every 1 to 3 years, using risk-based criteria.
  5. The IED ensures that the public has a right to participate in the decision-making process, and to be informed of its consequences, by having access to permit applications, permits and the results of the monitoring of releases.

References

Directive 2010/75/EU of the European Parliament and the Council on industrial emissions (the Industrial Emissions Directive or IED) is the main EU instrument regulating pollutant emissions from industrial installations.

The IED was adopted on 24 November 2010. It is based on a Commission proposal recasting seven previously existing directives (including in particular the IPPC Directive and the Waste Incineration Directive).

The IED aims to achieve a high level of protection of human health and the environment taken as a whole by reducing harmful industrial emissions across the EU, in particular through better application of Best Available Techniques (BAT). Around 50,000 installations undertaking the industrial activities listed in Annex I of the IED are required to operate in accordance with their Environmental Permit which contains conditions set in accordance with the principles and provisions of the IED[1].

References