Binn Eco Park EFW

Revision as of 09:53, 24 March 2021 by Bin52 (talk | contribs) (add page specific text)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)


Error: no local variable "site" has been set.
Error: no local variable "status" has been set.
Site Location
Site Location

See Residual EfW → page for a larger UK Wide map.

Waste Licence Error: no local variable "epr" has been set.
Operator [[Error: no local variable "operator" has been set.]]
Region [[:Category:Error: no local variable "region" has been set.|Error: no local variable "region" has been set.]]
Operational Capacity Error: no local variable "cap" has been set.ktpa
Is site R1? Error: no local variable "r1" has been set.
When was R1 Granted? Error: no local variable "r1date" has been set.
What was the R1 value Error: no local variable "r1value" has been set.
Electrical Capacity Error: no local variable "mwe" has been set.MWe
Number of Lines Error: no local variable "line" has been set.
Number of Turbines Error: no local variable "turbine" has been set.
CHP Error: no local variable "chp" has been set.
Technology Approach Error: no local variable "techtype" has been set.
Funding Type [[Error: no local variable "funding" has been set.]]

Operators Annual Report


Input Data

Year HH C&I Clin RDF Total


Output Data

Year IBA IBA %ge of Tot IN APC APC %ge of Tot IN

Rendered image of Binn Eco Park EFW from Iona Captial website, all rights reserved
Rendered image of Binn Eco Park EFW from Iona Captial website, all rights reserved


Summary

An EfW facility based upon conventional combustion technology that was granted planning permission in December 2020 and has a permitted capacity of 84,900 tonnes per annum. This consent replaced an earlier consent for a gasification technology with a capacity of 60,000 tonnes per annum.

The site is part of the wider activity at Binn Eco Park, near Perth, Scotland, owned by the Binn Group, and investment has been agreed for the facility with Iona Capital[1].

Technology

The plant technology will comprise standard moving grate technology, with an operational capacity of 89,00 tonnes per annum, generating 8.6MWe with 7.3MWe net for export.

Construction

The plant gained planning permission in December 2020. Construction is reported to commence in 2021 with operational handover in 2024. Earlier reports were the project would cost £70 million to deliver[2]

Waste Input

The plant is intended to run on residual Household Waste and Commercial Waste from the adjacent processing facilities on the site.

References