Vine Street EfW (Kirkless EfW)

Revision as of 09:54, 4 May 2021 by Arctellion (talk | contribs)

An EfW facility based upon conventional combustion technology and considered an ERF based on its R1 status. The Kirklees site has permitted operational capacity of 160,000 tonnes per annum, and is owned and operated by Suez. Delivery of waste is by road and the facility processes primarily residual Household Waste and some Commercial Waste.


Vine Street EfW (Kirkless EfW)
Operational
Site Location
Site Location

See Residual EfW → page for a larger UK Wide map.

Waste Licence BJ6178IX
Operator SUEZ
Region Yorkshire and the Humber
Operational Capacity 135ktpa
Is site R1? fal
When was R1 Granted? 2017-04-05
What was the R1 value 0.66
Electrical Capacity 9.50MWe
Number of Lines 1
Number of Turbines 1
CHP Yes
Technology Approach EfW
Funding Type PFI

Operators Annual Report


Input Data

Year HH C&I Clin RDF Total
2016 127510.00 0.00 0.00 0.00 127510.00
2017 132448.00 0.00 0.00 0.00 132448.00
2018 124476.60 0.00 0.00 0.00 124476.60
2019 129599.00 4066.00 278.00 0.00 133943.00
2020 121147.00 2739.00 343.00 0.00 124229.00
2021 132156.00 1652.00 775.00 0.00 134583.00
2022 118915.00 587.00 710.00 0.00 120212.00
2023 127556.00 3963.00 860.00 0.00 132379.00


Output Data

Year IBA IBA %ge of Tot IN APC APC %ge of Tot IN
2016 25528.00 20.02% 5114.00 4.01%
2017 26852.00 20.27% 4915.00 3.71%
2018 25074.00 20.14% 4713.00 3.79%
2019 26098.00 19.48% 5001.00 3.73%
2020 25794.00 20.76% 4441.00 3.57%
2021 47041.00 34.95% 8260.00 6.14%
2022 24055.00 20.01% 4058.00 3.38%
2023 25643.00 19.37% 4619.00 3.49%

Suez Kirklees
Suez Kirklees


Summary

An EfW facility based upon conventional combustion technology and considered an ERF based on its R1 status. The Kirklees site has permitted operational capacity of 160,000 tonnes per annum, and is owned and operated by Suez. Delivery of waste is by road and the facility processes primarily residual Household Waste and some Commercial Waste.

History

The Kirklees facility, in Huddersfield, was built primarily to service Kirklees Metropolitan Council under a 25 year PFI contract, signed in 1998 and due for completion in 2023 - but with the option to extend for five years to 2028 (and potentially operate to 2036)[1].

Plant

The plant is assumed to have been built by Lentjes (renamed Lurgi in 2006 and sold to A-Tec Industries AG in 2007) under a turnkey contract with a similar approach to Allington EFW. The facility commenced operation in 2002. The plant is 1 line with a design capacity capable of 17 tonnes/hour equivalent to around 139,000 tonnes per annum. Electricity is generated via standard combustion technology, utiliziing fluidised bed technology ROWITEC, generating super-heated steam, and is configured to run on residual Household Waste and Commercial Waste. The technology is understood to be capable of operating in a range of CV of between 6.5 and 30.0 MJ/kg depending on configuration[2].

Local Authority Users

Local Authority Data

The table below lists those local authorities who have recorded their tonnage on WasteDataFlow as sending their Waste to this site (either directly or via a transfer station) for the most recent financial year, data was updated on 2023-04-26. The tonnage received cannot be directly compared with the stated historical tonnage received and recorded in the EA statistics as these are recorded on a calendar year basis (i.e. January 2018 to December 2018). The total Local Authority waste received by the plant in the period was: 120,817.96t

A 'zero return' or a below expected return, when compared to the EA Data below indicates that either:

  • no local authority tonnage was recorded/no tonnage was sent to the site in the period (but has been listed as it may have previously received tonnage from a local authority) or
  • a result of the plant being recently commissioned and actually having received no tonnage or
  • a lower than expected tonnage maybe a result of a local authority splitting their tonnage over multiple sites, having less tonnage to send than might be anticipated or
  • it may be a new plant being in 'ramp up' towards full capacity after construction or
  • may be a result of plant shut down and subsequent re-start in a year or
  • the local authority may not have correctly entered the site's details on WasteDataFlow


Authority Tonnage
Kirklees MBC 120817.963

References