Showground Road

Revision as of 13:28, 23 August 2021 by Arctellion (talk | contribs)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)

An EfW facility based upon standard combustion technology. The Showground Road site is being delivered by a joint venture between Equitix and Iona Capital known as Bridgwater Resource Recovery Limited.


Showground Road
Under Construction
Site Location
Site Location

See Residual EfW → page for a larger UK Wide map.

Waste Licence UP3708SB
Operator Bridgwater Resource Recovery
Region South West
Operational Capacity 105ktpa
Is site R1? fal
When was R1 Granted?
What was the R1 value 0.00
Electrical Capacity 7.80MWe
Number of Lines 0
Number of Turbines 0
CHP No
Technology Approach EfW
Funding Type Merchant

Operators Annual Report


Input Data

Year HH C&I Clin RDF Total


Output Data

Year IBA IBA %ge of Tot IN APC APC %ge of Tot IN

Showground Road in Construction March 2021 - Image from STC all rights reserved
Showground Road in Construction March 2021 - Image from STC all rights reserved


Summary

An EfW facility based upon standard combustion technology. The Showground Road site is being delivered by a joint venture between Equitix and Iona Capital known as Bridgwater Resource Recovery Limited.

Technology

The plant is a 1 line, moving grate based technology by Kablitz, generating steam via a Comef boiler, to turbines delivering 7.75MWe.

Construction

The plant is being constructed under a turnkey EPC arrangement at a capital cost of GBP £72m by STC Power SRL and will be operated and maintained by Pinacle Power Limited, with operations due to commence in late 2021.

Waste Input

The plant is designed to run on 100,000 tonnes per year of prepared RDF under an exclusive supply/aggregation arrangement with Geminor[1].