Newhurst EFW

Revision as of 16:48, 6 April 2022 by Bin52 (talk | contribs) (change of ownership details)

An EfW facility based upon conventional combustion technology that reached financial close in February 2020. Newhurst EFW has a permitted capacity of 350,000 tonnes per annum.

Error: no local variable "site" has been set.
Error: no local variable "status" has been set.
Site Location
Site Location

See Residual EfW → page for a larger UK Wide map.

Waste Licence Error: no local variable "epr" has been set.
Operator [[Error: no local variable "operator" has been set.]]
Region [[:Category:Error: no local variable "region" has been set.|Error: no local variable "region" has been set.]]
Operational Capacity Error: no local variable "cap" has been set.ktpa
Is site R1? Error: no local variable "r1" has been set.
When was R1 Granted? Error: no local variable "r1date" has been set.
What was the R1 value Error: no local variable "r1value" has been set.
Electrical Capacity Error: no local variable "mwe" has been set.MWe
Number of Lines Error: no local variable "line" has been set.
Number of Turbines Error: no local variable "turbine" has been set.
CHP Error: no local variable "chp" has been set.
Technology Approach Error: no local variable "techtype" has been set.
Funding Type [[Error: no local variable "funding" has been set.]]

Operators Annual Report


Input Data

Year HH C&I Clin RDF Total


Output Data

Year IBA IBA %ge of Tot IN APC APC %ge of Tot IN

Newhurst EFW Artist Image - source Circular Online Magazine
Newhurst EFW Artist Image - source Circular Online Magazine


Summary

An EfW facility based upon conventional combustion technology that reached financial close in February 2020. Newhurst EFW has a permitted capacity of 350,000 tonnes per annum. The project is being developed by Covanta who will be the operator of the facility when constructed. The facility was 50% owned by Covanta and Macquarie's Green Investment Group and 50% by Biffa[1]. In March 2022 EQT, the owner of Covanta, bought the interests of the Green Investment Group in this and three other projects (Rookery Pit Energy Recovery Facility (Rookery South), Protos EFW, and Earls Gate Energy Centre) to leave Green Investment Group with no further interest in the projects[2].

Technology

The plant technology will comprise standard moving grate technology, producing super-heated steam, generating 42MWe.

Construction

The plant reached financial close in February 2020 and will delivered under a turnkey EPC arrangement with Hitachi Zosen Inova technology over a 39 month programme with technical oversight by Covanta[3][4].

Waste Input

The plant is intended to run on residual Household Waste and Commercial Waste with 70% provided from Biffa's existing local waste collection services.

References