Leyland Waste Treatment Facility

Revision as of 14:48, 27 April 2022 by Bin52 (talk | contribs) (minor text change)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)



Leyland Waste Treatment Facility
Lancashire Renewables Ltd
Site Location
Site Location

See Qualifying MRF → page for a larger UK Wide map.

Tonnage Summary
Data 2020
EA Tonnage IN 135,166.9
EA Tonnage OUT 133,084.04
Qualifying IN 55,488.72
Qualifying OUT 13,177.92

Summary

Text to be added

History

Text to be added

Plant

Text to be added



Permit Tonnage Received (IN)

Total Tonnage by EWC Code

The table shows a list of the Waste for the Permit AP3937KS, that has arrived into sites as reported to the Regulator and then publicised in their reported statistics. The Data was updated on Jan 21 - Dec 21. The total reported tonnage arriving at the site was: 135,166.9t.

EWC Code Description Tonnes In
18 01 07 chemicals other than those mentioned in 18 01 06 0.08
19 05 03 off-specification compost 1.12
19 12 01 paper and cardboard 124.00
19 12 10 combustible waste (refuse derived fuel) 23.98
19 12 12 other wastes (including mixtures of materials) from mechanical treatment of wastes other than those mentioned in 19 12 11 10.50
20 01 01 paper and cardboard 16,824.68
20 01 02 glass 27,401.06
20 01 39 plastics 26.28
20 01 40 metals 31,141.38
20 02 01 biodegradable waste 183.38
20 03 01 mixed municipal waste 54,597.80
20 03 03 street-cleaning residues 4,318.54
20 03 07 bulky waste 514.10

Total Tonnage by Origin of EWC Code

The table below shows the same data as the table above, but split according to the origin of each EWC code waste stream entering into the site as reported to the Regulator.

EWC Code Origin of Waste Tonnes In
18 01 07 North West 0.08
19 05 03 North West 1.12
19 12 01 North West 124.00
19 12 10 North West 23.98
19 12 12 North West 10.50
20 01 01 North West 16,824.68
20 01 02 North West 27,401.06
20 01 39 North West 26.28
20 01 40 North West 31,141.38
20 02 01 North West 183.38
20 03 01 North West 54,597.80
20 03 03 North West 4,318.54
20 03 07 North West 514.10




Permit Tonnage Sent Out (OUT)

The table shows a list of the Waste for the Permit AP3937KS, that has left the site as reported to the Regulator and then publicised in their reported statistics. The Data was updated on Jan 21 - Dec 21. The total reported tonnage arriving at the site was: 133,084.04t.

EWC Code Description Tonnes In
13 05 06* oil from oil/water separators 69.44
16 02 14 discarded equipment other than those mentioned in 16 02 09 to 16 02 13 26.32
16 10 02 aqueous liquid wastes other than those mentioned in 16 10 01 1,092.34
18 01 07 chemicals other than those mentioned in 18 01 06 0.06
19 12 01 paper and cardboard 14,359.66
19 12 02 ferrous metal 3,793.92
19 12 03 non-ferrous metal 1,754.96
19 12 04 plastic and rubber 7,763.84
19 12 05 glass 31,109.20
19 12 10 combustible waste (refuse derived fuel) 36,818.38
19 12 11* other wastes (including mixtures of materials) from mechanical treatment of waste containing dangerous substances 15.36
19 12 12 other wastes (including mixtures of materials) from mechanical treatment of wastes other than those mentioned in 19 12 11 22,688.44
20 01 01 paper and cardboard 855.22
20 01 02 glass 2,159.54
20 01 40 metals 2,846.72
20 03 01 mixed municipal waste 4,772.82
20 03 03 street-cleaning residues 2,957.82



Qualifying MRF Tonnage Received

During 2020 the site received 55,489t as qualifying material, as broken down below.


Quarter Supplier Tonnage Number of Samples Total Samples Weight (kg) Glass (%) Metal (%) Paper (%) Plastic (%) Overall (%) Non Target Material (%) Non Recycleable Material (%)
Jan-Mar Hyndburn 457.26 4 249.40 0.00 16.29 0.76 35.95 54.31 42.60 3.09
Jan-Mar Blackpool 2261.00 18 1145.10 0.00 19.34 3.91 37.14 56.20 35.48 8.32
Jan-Mar Preston 1131.26 9 542.50 0.00 19.08 4.13 38.50 61.71 34.28 4.01
Jan-Mar Chorley 1908.66 15 937.05 0.00 16.66 5.89 31.10 53.65 43.54 2.81
Jan-Mar Wyre 1852.16 14 869.10 0.00 17.84 3.03 30.10 50.98 45.75 3.27
Jan-Mar West Lancashire 1788.02 14 887.80 0.00 19.96 4.15 37.31 61.42 33.74 4.84
Jan-Mar South Ribble 1776.00 14 848.30 0.00 15.87 2.73 26.80 45.40 49.82 4.78
Jan-Mar Ribble Valley 829.12 6 366.95 0.00 16.21 6.33 31.52 54.06 33.65 12.29
Jan-Mar Pendle 1124.66 8 489.05 0.00 19.82 3.09 41.30 64.21 31.14 4.65
Jan-Mar Lancaster 954.72 7 429.95 0.00 18.73 4.74 32.96 56.43 39.88 3.69
Apr-Jun Preston 1020.60 6 367.50 0.00 15.78 2.96 31.45 50.19 45.28 4.53
Apr-Jun Chorley 2457.64 19 1145.91 0.00 13.96 2.29 22.14 38.38 57.93 3.69
Apr-Jun Blackpool 1437.16 9 588.95 0.00 19.27 2.62 30.86 52.74 44.07 3.19
Apr-Jun South Ribble 2229.34 18 1108.75 0.00 13.81 2.16 28.63 44.60 51.01 4.39
Apr-Jun West Lancashire 2265.90 14 844.95 0.00 18.39 3.39 37.93 59.70 36.40 3.90
Apr-Jun pendle 1326.20 10 608.61 0.00 19.35 3.80 38.13 61.28 35.40 3.32
Apr-Jun Ribble Valley 1091.64 4 241.70 0.00 19.70 2.69 35.65 58.04 37.42 4.54
Apr-Jun Lancaster 769.90 4 241.15 0.00 19.62 1.93 26.48 48.04 47.77 4.19
Apr-Jun Wyre 1582.36 12 724.15 0.00 18.43 1.50 34.65 54.58 40.70 4.72
Jul-Sep Wyre 1833.46 14 896.60 0.00 24.75 3.18 35.99 63.91 32.50 3.59
Jul-Sep Ribble Valley 708.06 5 300.70 0.00 17.54 1.03 33.58 54.50 41.60 3.90
Jul-Sep Chorley 2141.34 17 1024.70 0.00 11.67 2.54 24.55 39.24 53.54 7.22
Jul-Sep Rossendale 641.58 5 315.30 0.00 16.52 2.79 35.29 51.94 44.26 3.80
Jul-Sep pendle 867.52 7 420.75 0.00 17.44 2.70 34.52 54.66 41.53 3.81
Jul-Sep Blackpool 2626.92 21 1299.50 0.00 15.18 2.99 28.63 46.80 49.27 3.93
Jul-Sep West Lancashire 1986.38 15 905.30 0.00 16.33 2.54 34.46 53.33 42.60 4.07
Jul-Sep Hyndburn 397.82 3 181.05 0.00 14.31 3.48 35.27 53.06 41.89 5.05
Jul-Sep Preston 69.26 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Jul-Sep South Ribble 1943.58 15 905.00 0.00 13.56 3.32 28.31 45.19 48.44 6.37
Oct-Dec Rossendale 1066.74 8 481.35 0.00 19.99 5.96 34.99 60.94 33.84 5.22
Oct-Dec Pendle 1101.14 8 482.15 0.00 19.93 2.84 35.39 58.16 36.87 4.97
Oct-Dec Ribble Valley 888.34 7 427.30 0.00 20.20 3.75 34.51 58.46 38.17 3.37
Oct-Dec South Ribble 1864.50 14 841.85 0.00 14.85 2.23 24.17 41.26 54.43 4.31
Oct-Dec Chorley 2096.62 16 969.35 0.00 11.71 2.83 20.47 35.28 60.24 4.48
Oct-Dec Blackpool 2586.28 20 1208.50 0.00 17.15 3.39 31.59 52.13 42.48 5.39
Oct-Dec West Lancashire 1969.06 15 907.40 0.00 19.26 2.85 33.23 55.34 39.55 5.11
Oct-Dec Wyre 1266.78 10 693.10 0.00 21.40 4.19 32.66 58.25 36.83 4.92
Oct-Dec Hyndburn 1169.74 9 544.10 0.00 18.03 3.23 31.49 52.75 42.41 4.84


Qualifying MRF Tonnage Sent Out

During 2020 the site removed13,178t of qualifying material, as broken down below.


Quarter Material Tonnage Number of Samples Total Samples Weight Target Material (%) Non Target Material (%) Non Recycleable Material (%)
Apr-Jun Metal 950.74 47 473.80 97.56 1.17 1.27
Apr-Jun Plastic 719.72 47 958.00 80.27 18.83 0.90
Apr-Jun Metal 412.12 20 203.45 95.76 2.96 1.28
Apr-Jun Plastic 866.14 57 1150.00 92.71 4.99 2.30
Apr-Jun Plastic 145.18 9 185.00 54.79 44.14 1.07
Apr-Jun Plastic 287.38 19 382.00 97.04 1.87 1.09
Jan-Mar Plastic 351.16 23 463.00 97.89 1.38 0.73
Jan-Mar Plastic 177.46 11 222.75 48.40 50.86 0.74
Jan-Mar Metal 1062.28 53 542.55 97.52 1.63 0.85
Jan-Mar Plastic 840.06 56 1184.50 92.92 4.92 2.16
Jan-Mar Plastic 759.22 51 1039.00 81.21 18.18 0.61
Jan-Mar Metal 387.34 19 197.95 95.62 3.16 1.22
Jul-Sep Plastic 725.44 48 968.20 89.58 7.31 3.11
Jul-Sep Plastic 248.10 16 324.05 97.43 1.72 0.85
Jul-Sep Plastic 162.86 10 202.35 43.67 54.95 1.38
Jul-Sep Metal 820.54 41 413.70 97.94 1.15 0.91
Jul-Sep Metal 388.90 19 194.05 95.99 2.39 1.62
Jul-Sep Plastic 708.28 47 949.35 75.97 23.45 0.58
Oct-Dec Plastic 154.60 10 202.50 49.42 48.89 1.69
Oct-Dec Plastic 747.98 49 983.00 88.50 7.99 3.51
Oct-Dec Plastic 288.68 19 386.85 97.38 1.85 0.77
Oct-Dec Plastic 707.00 47 948.50 78.01 21.19 0.80
Oct-Dec Metal 392.32 19 192.90 95.88 2.75 1.37
Oct-Dec Metal 874.42 43 437.00 97.99 0.86 1.15

References