Holbrook Community REC

Revision as of 15:41, 1 August 2022 by Bin52 (talk | contribs)



[1]

Error: no local variable "site" has been set.
Error: no local variable "status" has been set.
Site Location
Site Location

See Biomass EfW → page for a larger UK Wide map.

Operator Error: no local variable "operator" has been set.
Capacity Error: no local variable "capacity" has been set. MWe
Feedstock Error: no local variable "mainfeed" has been set.
EPR (Waste Licence) Error: no local variable "epr" has been set.
ROC Error: no local variable "roc" has been set.
CfD Error: no local variable "cfdcap" has been set.
CHP Error: no local variable "chp" has been set.

Operators Annual Report


Input Data

Year Wood Litter RDF Other Total
2018 20530 0 0 0 20530
2019 31798 0 0 0 31798
2020 31202 0 0 0 31202
2021 48716 0 0 0 48716
2022 29820 0 0 0 29820


Output Data

Year IBA IBA %ge of Tot IN APC APC %ge of Tot IN
2018 356 1.73% 312 1.52%
2019 826 2.60% 538 1.69%
2020 911 2.92% 287 0.92%
2021 1153 2.37% 910 1.87%
2022 647 2.17% 616 2.06%

Holbrook Community Renewable Energy Centre
Holbrook Community Renewable Energy Centre

Summary

A Biomass EfW facility based on up to 55,000 tonnes per annum of Wood Waste producing 6.5 MWe gross power to be exported to the national grid. This facility is a Combined Heat and Power (CHP) plant, enough heat is produced and harnessed to supply approximately 6,700 local homes and commercial properties. Holbrook Community Renewable Energy Centre is located in Sheffield[2].

The Wood Waste feedstock is locally supplied by Mid UK Recycling. The operator of this facility is Veolia Energy Services Ltd[2].

Plant

The Design and Build EPC contractor for this development was Kandor Energy Ltd[3].

The facility cost £30m to develop and became operational in 2017[4]

The technology utilised in this facility is two water-cooled moving grate furnaces that are supplied by Turboden Srl (part of the Mitsubishi Heavy Industries Group). Turboden Srl also supplied the ‘organic rankin cycle’ (ORC) turbogenerators with air condensers for the facility which uses ‘organic fluid’ vapour as the driving force for the turbine within a closed loop heating circuit[2].

Tonnage Input/Fuel

The tonnage received by the plant is only Wood Waste Biomass and in the most recent Annual Sustainability Report for 2018-19[5] Ofgem reported the following fuel received:

Biomass Tonnage (2018-19)
Wood Waste 21,188
Other 0
Total 21,188

The Wood Waste tonnage received cannot be directly compared with the stated historical tonnage received and recorded in the EA statistics as these are recorded on a calendar year basis (i.e. January 2018 to December 2018) and were 33,821 tonnes.

References