Binn Eco Park EFW

Revision as of 11:08, 8 May 2024 by Bin52 (talk | contribs) (add page specific text)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)


An EfW facility based upon conventional combustion technology that was granted planning permission in December 2020 and has a permitted capacity of 84,900 tonnes per annum. This consent replaced an earlier consent for a gasification technology with a capacity of 60,000 tonnes per annum.


Binn Eco Park EFW
Under Construction
Site Location
Site Location

See Residual EfW → page for a larger UK Wide map.

Waste Licence Tbc09
Operator Paprec Energies Binn
Region Scotland
Operational Capacity 85ktpa
Is site R1? fal
When was R1 Granted?
What was the R1 value 0.00
Electrical Capacity 7.30MWe
Number of Lines 0
Number of Turbines 0
CHP No
Technology Approach EfW
Funding Type [[]]

Operators Annual Report


Input Data

Year HH C&I Clin RDF Total


Output Data

Year IBA IBA %ge of Tot IN APC APC %ge of Tot IN

Rendered image of Binn Eco Park EFW from Iona Captial website, all rights reserved
Rendered image of Binn Eco Park EFW from Iona Captial website, all rights reserved


Summary

An EfW facility based upon conventional combustion technology that was granted planning permission in December 2020 and has a permitted capacity of 84,900 tonnes per annum. This consent replaced an earlier consent for a gasification technology with a capacity of 60,000 tonnes per annum. Construction was reported to have commenced in May 2024 with planned operation by early 2026[1].

The site is part of the wider activity at Binn Eco Park, near Perth, Scotland, owned by the Binn Group, funded by Paprec for 120m euros[2] it will be built and operated by Paprec Energies Binn a joint venture between Paprec and the Binn Group.

Technology

The plant technology will comprise standard moving grate technology by Martin[3], with an operational capacity of 89,000 tonnes per annum, generating 8.6MWe with 7.3MWe net for export.

Construction

The plant gained planning permission in December 2020. Construction was reported to have commenced in may 2024 for operation by early 2026[4].

Waste Input

The plant is intended to run on residual Household Waste and Commercial Waste from the adjacent processing facilities on the site.