Hazardous Landfill

Revision as of 16:54, 12 November 2019 by MCWaste (talk | contribs) (Added reference)

Only a Hazardous Landfill can accept Hazardous Waste for LandfillDisposal but only then if it meets the relevant standards for engineering and management controls and Waste Acceptance Criteria set out in the Annex to the Decision, but it may also be able to accept Non-Hazardous Waste andInert Waste.

There are numerical limit values for leachable inorganic substances, organic content along with standards for physical stability. These exist for both granular and monolithic hazardous waste.

Standards require Hazardous Waste that is disposed of with other Non-hazardous Waste to be in separate engineered cells within the Landfill where stable non-reactive Hazardous Waste or Gypsum waste is to be disposed of[1].

References

  1. Defra (2010). Environmental Permitting Guidance: The Landfill Directive for the Environmental Permitting (England and Wales) Regulations 2010. London: Department for Environment, Food and Rural Affairs, p.7.