Battlefield EfW

Revision as of 14:28, 3 February 2020 by Admin (talk | contribs) (Imported from text file)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)


Battlefield EfW
Operational
Site Location
Site Location

See Residual EfW → page for a larger UK Wide map.

Waste Licence XP3239GF
Operator Veolia
Region West Midlands
Operational Capacity 102ktpa
Is site R1? fal
When was R1 Granted? 2011-11-10
What was the R1 value 0.67
Electrical Capacity 8.00MWe
Number of Lines 1
Number of Turbines 1
CHP Yes
Technology Approach EfW
Funding Type PFI

Operators Annual Report


Input Data

Year HH C&I Clin RDF Total
2016 71651.00 22770.00 0.00 0.00 94421.00
2017 80534.00 16297.00 0.00 0.00 96831.00
2018 95691.00 801.00 0.00 0.00 96492.00
2019 98515.00 0.00 0.00 0.00 98515.00
2020 99254.00 0.00 0.00 0.00 99254.00
2021 100488.00 0.00 0.00 0.00 100488.00
2022 97938.00 0.00 0.00 0.00 97938.00
2023 97163.00 0.00 0.00 573.00 97736.00


Output Data

Year IBA IBA %ge of Tot IN APC APC %ge of Tot IN
2016 19109.00 20.24% 2545.00 2.70%
2017 19698.00 20.34% 2484.00 2.57%
2018 18750.00 19.43% 2401.00 2.49%
2019 18014.00 18.29% 2440.00 2.48%
2020 18747.00 18.89% 2264.00 2.28%
2021 19305.00 19.21% 2264.00 2.25%
2022 17819.00 18.19% 2163.00 2.21%
2023 17424.00 17.83% 2105.00 2.15%

Summary

History

Plant

Local Authority Users

References