Beddington EfW

Revision as of 14:28, 3 February 2020 by Admin (talk | contribs) (Imported from text file)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)


Beddington EfW
Operational
Site Location
Site Location

See Residual EfW → page for a larger UK Wide map.

Waste Licence TP3836CT
Operator Viridor
Region London
Operational Capacity 347ktpa
Is site R1? fal
When was R1 Granted?
What was the R1 value 0.88
Electrical Capacity 26.00MWe
Number of Lines 2
Number of Turbines 1
CHP Yes
Technology Approach EfW
Funding Type PPP

Operators Annual Report


Input Data

Year HH C&I Clin RDF Total
2016 0.00 0.00 0.00 0.00 0.00
2017 0.00 0.00 0.00 0.00 0.00
2018 59801.00 20515.00 0.00 0.00 80316.00
2019 94447.00 57197.00 0.00 0.00 151644.00
2020 210137.00 114593.00 0.00 0.00 324730.00
2021 209382.00 115171.00 0.00 0.00 324553.00
2022 197023.00 136798.00 0.00 0.00 333821.00
2023 200430.00 130700.00 0.00 0.00 331130.00


Output Data

Year IBA IBA %ge of Tot IN APC APC %ge of Tot IN
2016 0.00 0.00% 0.00 0.00%
2017 0.00 0.00% 0.00 0.00%
2018 192.00 0.24% 17.10 0.02%
2019 36303.00 23.94% 3169.00 2.09%
2020 79308.00 24.42% 5946.00 1.83%
2021 77847.00 23.99% 6163.00 1.90%
2022 79058.00 23.68% 5918.00 1.77%
2023 74243.00 22.42% 5726.00 1.73%

Summary

History

Plant

Local Authority Users

References