Chineham ERF (Integra North)

Revision as of 14:28, 3 February 2020 by Admin (talk | contribs) (Imported from text file)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)


Chineham ERF (Integra North)
Operational
Site Location
Site Location

See Residual EfW → page for a larger UK Wide map.

Waste Licence BJ7786IV
Operator Veolia
Region South East
Operational Capacity 110ktpa
Is site R1? fal
When was R1 Granted? 2017-10-03
What was the R1 value 0.00
Electrical Capacity 8.00MWe
Number of Lines 1
Number of Turbines 1
CHP No
Technology Approach EfW
Funding Type PPP

Operators Annual Report


Input Data

Year HH C&I Clin RDF Total
2016 97997.00 0.00 0.00 0.00 97997.00
2017 93374.00 0.00 0.00 0.00 93374.00
2018 71466.00 21711.00 0.00 0.00 93177.00
2019 67827.00 26323.00 0.00 0.00 94150.00
2020 78457.00 20948.00 330.00 0.00 99735.00
2021 80849.00 25843.00 159.00 0.00 106851.00
2022 67511.00 28367.00 20.00 0.00 95898.00
2023 76702.00 28190.00 0.00 0.00 104892.00


Output Data

Year IBA IBA %ge of Tot IN APC APC %ge of Tot IN
2016 16723.00 17.06% 2847.00 2.91%
2017 16013.00 17.15% 2573.00 2.76%
2018 16100.00 17.28% 2637.00 2.83%
2019 15611.00 16.58% 2705.00 2.87%
2020 16133.00 16.18% 2694.00 2.70%
2021 17477.00 16.36% 2637.00 2.47%
2022 15311.00 15.97% 2344.00 2.44%
2023 19257.00 18.36% 2438.00 2.32%

Summary

History

Plant

Local Authority Users

References