Cornwall ERC

Revision as of 14:28, 3 February 2020 by Admin (talk | contribs) (Imported from text file)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)


Cornwall ERC
Operational
Site Location
Site Location

See Residual EfW → page for a larger UK Wide map.

Waste Licence GP3433GH
Operator SUEZ
Region South West
Operational Capacity 240ktpa
Is site R1? fal
When was R1 Granted? 2020-02-03
What was the R1 value 0.76
Electrical Capacity 24.00MWe
Number of Lines 2
Number of Turbines 1
CHP No
Technology Approach EfW
Funding Type PFI

Operators Annual Report


Input Data

Year HH C&I Clin RDF Total
2016 0.00 0.00 0.00 0.00 0.00
2017 35830.10 0.00 12.08 151587.25 187429.43
2018 41681.71 0.00 223.36 179672.34 221577.41
2019 153899.00 89357.00 20.00 0.00 243276.00
2020 162489.00 82086.00 0.00 0.00 244575.00
2021 168449.00 78777.00 0.00 0.00 247226.00
2022 154896.00 90780.00 0.00 0.00 245676.00
2023 156149.00 87302.00 0.00 0.00 243451.00


Output Data

Year IBA IBA %ge of Tot IN APC APC %ge of Tot IN
2016 0.00 0.00% 0.00 0.00%
2017 44012.64 23.48% 4447.50 2.37%
2018 41677.54 18.81% 5705.32 2.57%
2019 45524.00 18.71% 6200.00 2.55%
2020 47909.00 19.59% 5613.00 2.30%
2021 47041.00 19.03% 5716.00 2.31%
2022 43011.00 17.51% 5092.00 2.07%
2023 38473.00 15.80% 5030.00 2.07%

Summary

History

Plant

Local Authority Users

References