Dunbar EfW (Oxwellmains EfW)

Revision as of 14:28, 3 February 2020 by Admin (talk | contribs) (Imported from text file)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)


Dunbar EfW (Oxwellmains EfW)
Operational
Site Location
Site Location

See Residual EfW → page for a larger UK Wide map.

Waste Licence PPC/A/1032878
Operator Viridor
Region Scotland
Operational Capacity 390ktpa
Is site R1? fal
When was R1 Granted?
What was the R1 value 0.74
Electrical Capacity 31.00MWe
Number of Lines 2
Number of Turbines 1
CHP No
Technology Approach EfW
Funding Type Merchant

Operators Annual Report


Input Data

Year HH C&I Clin RDF Total
2016 0.00 0.00 0.00 0.00 0.00
2017 0.00 0.00 0.00 0.00 0.00
2018 0.00 0.00 0.00 0.00 0.00
2019 250728.80 0.00 0.00 0.00 250728.80
2020 314909.00 0.00 0.00 0.00 314909.00
2021 96815.00 12219.00 1762.00 207230.00 320374.00
2022 103007.00 51957.00 2370.00 164657.00 322045.00
2023 128340.00 74184.00 2786.00 150181.00 362106.00


Output Data

Year IBA IBA %ge of Tot IN APC APC %ge of Tot IN
2016 0.00 0.00% 0.00 0.00%
2017 0.00 0.00% 0.00 0.00%
2018 0.00 0.00% 0.00 0.00%
2019 0.00 0.00% 0.00 0.00%
2020 0.00 0.00% 0.00 0.00%
2021 64480.00 20.13% 8510.00 2.66%
2022 61973.00 19.24% 7558.00 2.35%
2023 69072.00 19.08% 8383.00 2.32%

Summary

History

Plant

Local Authority Users

References