Lakeside EfW

Revision as of 14:29, 3 February 2020 by Admin (talk | contribs) (Imported from text file)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)


Lakeside EfW
Operational
Site Location
Site Location

See Residual EfW → page for a larger UK Wide map.

Waste Licence BT7116IW
Operator Viridor & Grundon Waste Management
Region South East
Operational Capacity 468ktpa
Is site R1? fal
When was R1 Granted? 2015-09-12
What was the R1 value 0.68
Electrical Capacity 37.00MWe
Number of Lines 2
Number of Turbines 1
CHP No
Technology Approach EfW
Funding Type PPP

Operators Annual Report


Input Data

Year HH C&I Clin RDF Total
2016 0.00 0.00 0.00 0.00 0.00
2017 0.00 0.00 0.00 0.00 0.00
2018 0.00 0.00 0.00 0.00 0.00
2019 0.00 0.00 0.00 0.00 0.00
2020 261967.00 155012.00 316.00 0.00 417791.00
2021 234494.00 157409.00 1163.00 0.00 393522.00
2022 255084.00 170094.00 12.00 0.00 425237.00
2023 247682.00 163285.00 1776.00 0.00 412802.00


Output Data

Year IBA IBA %ge of Tot IN APC APC %ge of Tot IN
2016 80033.40 0.00% 12653.58 0.00%
2017 81724.96 0.00% 12853.76 0.00%
2018 77619.00 0.00% 12478.00 0.00%
2019 76164.00 0.00% 12651.00 0.00%
2020 78462.00 18.78% 12422.00 2.97%
2021 73819.00 18.76% 11925.00 3.03%
2022 78342.00 18.42% 11156.00 2.62%
2023 75348.00 18.25% 11713.00 2.84%

Summary

History

Plant

Local Authority Users

References