Peterborough EfW

Revision as of 14:29, 3 February 2020 by Admin (talk | contribs) (Imported from text file)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)


Peterborough EfW
Operational
Site Location
Site Location

See Residual EfW → page for a larger UK Wide map.

Waste Licence NP3638ZS
Operator Viridor
Region Eastern
Operational Capacity 110ktpa
Is site R1? fal
When was R1 Granted? 2015-03-11
What was the R1 value 0.80
Electrical Capacity 7.30MWe
Number of Lines 1
Number of Turbines 1
CHP No
Technology Approach EfW
Funding Type PPP

Operators Annual Report


Input Data

Year HH C&I Clin RDF Total
2016 84454.35 0.00 0.00 0.00 84454.35
2017 81248.32 0.00 0.00 0.00 81248.32
2018 55686.61 27994.07 0.00 0.00 83680.68
2019 48061.00 32221.00 1824.00 0.00 82106.00
2020 53262.00 28051.00 4659.00 0.00 85972.00
2021 57899.00 21507.00 4913.00 0.00 84319.00
2022 60425.27 21906.47 7862.50 0.00 90938.67
2023 51132.00 18927.00 9846.00 5413.00 86093.00


Output Data

Year IBA IBA %ge of Tot IN APC APC %ge of Tot IN
2016 19200.64 22.73% 1948.30 2.31%
2017 17968.81 22.12% 2204.04 2.71%
2018 17384.77 20.78% 2139.04 2.56%
2019 17602.00 21.44% 2390.00 2.91%
2020 17708.00 20.60% 2224.00 2.59%
2021 17697.00 20.99% 1828.00 2.17%
2022 19541.13 21.49% 1934.65 2.13%
2023 17916.57 20.81% 1746.06 2.03%

Summary

History

Plant

Local Authority Users

References