Riverside Resource Recovery Facility (RRRF)

Revision as of 14:29, 3 February 2020 by Admin (talk | contribs) (Imported from text file)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)


Riverside Resource Recovery Facility (RRRF)
Operational
Site Location
Site Location

See Residual EfW → page for a larger UK Wide map.

Waste Licence BK0825IU
Operator Cory Riverside Energy
Region London
Operational Capacity 850ktpa
Is site R1? fal
When was R1 Granted? 2013-01-10
What was the R1 value 0.76
Electrical Capacity 80.50MWe
Number of Lines 3
Number of Turbines 1
CHP No
Technology Approach EfW
Funding Type PPP

Operators Annual Report


Input Data

Year HH C&I Clin RDF Total
2016 0.00 0.00 0.00 0.00 0.00
2017 0.00 0.00 0.00 0.00 0.00
2018 430065.42 309870.97 0.00 0.00 739936.39
2019 427986.00 321448.00 0.00 0.00 749434.00
2020 404239.00 344962.00 0.00 0.00 754418.00
2021 430618.00 358305.00 0.00 4605.00 789492.00
2022 410185.00 392602.00 0.00 0.00 802787.00
2023 424934.00 377743.00 0.00 0.00 802677.00


Output Data

Year IBA IBA %ge of Tot IN APC APC %ge of Tot IN
2016 190246.00 0.00% 18372.00 0.00%
2017 175220.00 0.00% 18184.00 0.00%
2018 175420.00 23.71% 18688.00 2.53%
2019 169953.00 22.68% 18456.00 2.46%
2020 171644.00 22.75% 18598.00 2.47%
2021 168575.00 21.35% 19973.00 2.53%
2022 169061.00 21.06% 17602.00 2.19%
2023 168132.00 20.95% 18862.00 2.35%

Summary

History

Plant

Local Authority Users

References