Allerton Waste Recovery Park (EfW)

Revision as of 13:44, 7 February 2020 by Bin52 (talk | contribs) (add picture and link)
Amey Cespa Allerton
Amey Cespa Allerton


Error: no local variable "site" has been set.
Error: no local variable "status" has been set.
Site Location
Site Location

See Residual EfW → page for a larger UK Wide map.

Waste Licence Error: no local variable "epr" has been set.
Operator [[Error: no local variable "operator" has been set.]]
Region [[:Category:Error: no local variable "region" has been set.|Error: no local variable "region" has been set.]]
Operational Capacity Error: no local variable "cap" has been set.ktpa
Is site R1? Error: no local variable "r1" has been set.
When was R1 Granted? Error: no local variable "r1date" has been set.
What was the R1 value Error: no local variable "r1value" has been set.
Electrical Capacity Error: no local variable "mwe" has been set.MWe
Number of Lines Error: no local variable "line" has been set.
Number of Turbines Error: no local variable "turbine" has been set.
CHP Error: no local variable "chp" has been set.
Technology Approach Error: no local variable "techtype" has been set.
Funding Type [[Error: no local variable "funding" has been set.]]

Operators Annual Report


Input Data

Year HH C&I Clin RDF Total
2016 0.00 0.00 0.00 0.00 0.00
2017 0.00 0.00 0.00 0.00 0.00
2018 222732.68 0.00 0.00 6693.00 243520.78
2019 256001.00 0.00 0.00 0.00 256001.00
2020 0.00 0.00 0.00 0.00 0.00
2021 287485.00 0.00 0.00 0.00 294009.00
2022 271746.00 7882.00 0.00 0.00 286293.00


Output Data

Year IBA IBA %ge of Tot IN APC APC %ge of Tot IN
2016 0.00 0.00% 0.00 0.00%
2017 0.00 0.00% 0.00 0.00%
2018 55464.84 22.78% 8274.35 3.40%
2019 54423.00 21.26% 9105.00 3.56%
2020 0.00 0.00% 0.00 0.00%
2021 61695.00 20.98% 10208.00 3.47%
2022 60655.00 21.19% 9397.00 3.28%

Summary

History

Plant

Local Authority Users

References