Great Blakenham EfW

Revision as of 13:59, 7 February 2020 by Bin52 (talk | contribs) (add picture and link)
Suez Great Blakenham
Suez Great Blakenham


Great Blakenham EfW
Operational
Site Location
Site Location

See Residual EfW → page for a larger UK Wide map.

Waste Licence WP3438HZ
Operator SUEZ
Region Eastern
Operational Capacity 295ktpa
Is site R1? fal
When was R1 Granted? 2014-05-06
What was the R1 value 0.83
Electrical Capacity 26.00MWe
Number of Lines 2
Number of Turbines 1
CHP No
Technology Approach EfW
Funding Type PFI

Operators Annual Report


Input Data

Year HH C&I Clin RDF Total
2016 234974.92 822.58 1876.12 28865.74 266539.36
2017 244731.60 864.54 2253.38 19345.18 267194.70
2018 231780.00 1285.00 2345.00 30757.00 266167.00
2019 240953.00 25836.00 3983.00 0.00 270776.00
2020 249840.00 38469.00 3077.00 0.00 291389.00
2021 233448.00 54170.00 3991.00 0.00 291609.00
2022 219661.00 58568.00 4808.00 0.00 283037.00
2023 253294.00 33625.00 7689.00 0.00 294608.00


Output Data

Year IBA IBA %ge of Tot IN APC APC %ge of Tot IN
2016 49830.48 18.70% 6250.64 2.35%
2017 49033.62 18.35% 6264.84 2.34%
2018 62881.86 23.62% 6508.28 2.45%
2019 47389.00 17.50% 5754.00 2.13%
2020 58294.00 20.01% 6300.00 2.16%
2021 53574.00 18.37% 7150.00 2.45%
2022 48055.00 16.98% 7046.00 2.49%
2023 52061.00 17.67% 7386.00 2.51%

Summary

History

Plant

Local Authority Users

References