SELCHP ERF
SELCHP ERF Operational | |
See Residual EfW → page for a larger UK Wide map. | |
Waste Licence | NP3738SY |
Operator | Veolia (SELCHP) |
Region | London |
Operational Capacity | 464ktpa |
Is site R1? | fal |
When was R1 Granted? | 2015-05-10 |
What was the R1 value | 0.60 |
Electrical Capacity | 35.00MWe |
Number of Lines | 2 |
Number of Turbines | 1 |
CHP | Yes |
Technology Approach | EfW |
Funding Type | PPP |
Operators Annual Report
Input Data
Year | HH | C&I | Clin | RDF | Total |
---|---|---|---|---|---|
2016 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 |
2017 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 |
2018 | 403969.00 | 30577.00 | 84.00 | 0.00 | 434630.00 |
2019 | 410005.00 | 222.00 | 95.00 | 0.00 | 439232.00 |
2020 | 348125.35 | 10847.30 | 78.00 | 10177.52 | 369228.17 |
2021 | 394710.00 | 137.00 | 219.00 | 622.00 | 434180.00 |
2022 | 388192.00 | 144.00 | 124.00 | 0.00 | 428704.00 |
2023 | 351830.00 | 480.00 | 89.00 | 0.00 | 391853.00 |
Output Data
Year | IBA | IBA %ge of Tot IN | APC | APC %ge of Tot IN |
---|---|---|---|---|
2016 | 88446.00 | 0.00% | 12264.00 | 0.00% |
2017 | 88446.00 | 0.00% | 12264.00 | 0.00% |
2018 | 85947.00 | 19.77% | 12043.00 | 2.77% |
2019 | 84861.00 | 19.32% | 11870.00 | 2.70% |
2020 | 80698.00 | 21.86% | 10929.00 | 2.96% |
2021 | 82211.00 | 18.93% | 10666.00 | 2.46% |
2022 | 77961.00 | 18.19% | 10102.00 | 2.36% |
2023 | 74955.00 | 19.13% | 9910.00 | 2.53% |
Summary
History
Plant
Local Authority Users
The following data comes from WasteDataFlow for the financial year 2018/19 and represents those local authorities recorded as putting tonnage into the site (either directly or via a transfer station). The tonnage received cannot be directly compared with the stated historical tonnage received and recorded in the EA statistics as these are recorded on a calendar year basis (i.e. January 2018 to December 2018). A 'zero return' below indicates no local authority tonnage was recorded, most likely a result of the plant being recently commissioned and actually having received no tonnage. Equally, lower than expected tonnage maybe a result of either a new plant being in 'ramp up' towards full capacity after construction, or may be a result of plant shut down and subsequent re-start in a year.
Authority | Tonnage |
---|---|
Bromley LB | 70842.209 |
Greenwich LB | 69971.210 |
Lewisham LB | 79898.820 |
Medway Borough Council | 18696.700 |
Southwark LB | 38648.615 |
West Berkshire District Council | 2590.060 |
Westminster City Council | 120172.080 |