SELCHP ERF

Revision as of 14:14, 19 February 2020 by MCWaste (talk | contribs) (Links)


SELCHP ERF
Operational
Site Location
Site Location

See Residual EfW → page for a larger UK Wide map.

Waste Licence NP3738SY
Operator Veolia (SELCHP)
Region London
Operational Capacity 464ktpa
Is site R1? fal
When was R1 Granted? 2015-05-10
What was the R1 value 0.60
Electrical Capacity 35.00MWe
Number of Lines 2
Number of Turbines 1
CHP Yes
Technology Approach EfW
Funding Type PPP

Operators Annual Report


Input Data

Year HH C&I Clin RDF Total
2016 0.00 0.00 0.00 0.00 0.00
2017 0.00 0.00 0.00 0.00 0.00
2018 403969.00 30577.00 84.00 0.00 434630.00
2019 410005.00 222.00 95.00 0.00 439232.00
2020 348125.35 10847.30 78.00 10177.52 369228.17
2021 394710.00 137.00 219.00 622.00 434180.00
2022 388192.00 144.00 124.00 0.00 428704.00
2023 351830.00 480.00 89.00 0.00 391853.00


Output Data

Year IBA IBA %ge of Tot IN APC APC %ge of Tot IN
2016 88446.00 0.00% 12264.00 0.00%
2017 88446.00 0.00% 12264.00 0.00%
2018 85947.00 19.77% 12043.00 2.77%
2019 84861.00 19.32% 11870.00 2.70%
2020 80698.00 21.86% 10929.00 2.96%
2021 82211.00 18.93% 10666.00 2.46%
2022 77961.00 18.19% 10102.00 2.36%
2023 74955.00 19.13% 9910.00 2.53%

Summary

An EfW facility based upon conventional combustion technology and considered an ERF based on its R1 status. SELCHP ERF, standing for South East London Combined Heat and Power Energy Recover Facility, is located on Landmann Way, off Surrey Canal Road, Lewisham, London. The facility has a permitted operational capacity of 420,000 tonnes per annum of waste, and produces both heat and power, exporting up to 35 MW electricity to the national grid after the plants own power needs are supplied for, and supplying the district heating network with hot water.

The plant is owned and operated by Veolia. The waste feedstock utilised at the plant is primarily residual waste arising from households and businesses in or close to London[1].

History

South East London Combined Heat and Power was formed in 1988 by the London Boroughs of Lewisham, Southwark and Greenwich to provide an alternative waste disposal strategy to landfill, members also included the Regional Electricity Company and Energy from Waste design, construction and operation specialists. Following an in-depth feasibility study, consultations, and an Environmental Impact Assessment for the proposed ERF, conditional Planning Permission for the project was granted in 1990 and in 1991 site clearance and construction began[2].

In 1992, SELCHP was the first Energy from Waste scheme to be granted an authorisation under the Integrated Pollution Control provisions of the Environmental Protection Act 1990. 1992 was also the year that SELCHP was awarded an Electricity Generation Licence by the Office of Electricity Regulation[2].

Construction and commissioning of the facility was complete in 1993, being officially opened in 1994 by HRH the Prince of Wales[2].

In 1998, a new system to reduce emissions of Nitrogen Oxide was installed to allow the facility to to meet the new emission levels required by the Environment Agency[2].

Initially, the facility was planned to produce heat as well as electricity, but due to political and legislative changes, this was not enabled when the plant was constructed. The pipe systems and equipment for the heat from the facility to be utilised was not installed completely until 2014, and has been in operation since then[3].

Plant

SELCHP is a successful commercial partnership between the public and private sectors. The partnering organisations that enabled this project to be achieved include: Veolia, iCON Infrastructure, Lewisham Council, Royal Borough of Greenwich, EDF Energy, ENER-G and John Laing plc.

The EPC contractor for this project was awarded to Martin Engineering Systems Ltd. The combustion technology implements the mass-burn process to incinerate waste[1].

SELCHP ERF is jointly owned by current operator Veolia Environmental Services and consortium CNIM Development, and in 2019, celebrated 25 years of operations[4].

Local Authority Users

The following data comes from WasteDataFlow for the financial year 2018/19 and represents those local authorities recorded as putting tonnage into the site (either directly or via a transfer station). The tonnage received cannot be directly compared with the stated historical tonnage received and recorded in the EA statistics as these are recorded on a calendar year basis (i.e. January 2018 to December 2018). A 'zero return' below indicates no local authority tonnage was recorded, most likely a result of the plant being recently commissioned and actually having received no tonnage. Equally, lower than expected tonnage maybe a result of either a new plant being in 'ramp up' towards full capacity after construction, or may be a result of plant shut down and subsequent re-start in a year.


Authority Tonnage
Bromley LB 70842.209
Greenwich LB 69971.210
Lewisham LB 79898.820
Medway Borough Council 18696.700
Southwark LB 38648.615
West Berkshire District Council 2590.060
Westminster City Council 120172.080

References