Coatbridge Renewable Energy Facility

An EfW facility based upon Gasification technology. Shore Energy envisaged an RDF production facility adjacent to the EfW facility on the site.


Error: no local variable "site" has been set.
Error: no local variable "status" has been set.
Site Location
Site Location

See Residual EfW → page for a larger UK Wide map.

Waste Licence Error: no local variable "epr" has been set.
Operator [[Error: no local variable "operator" has been set.]]
Region [[:Category:Error: no local variable "region" has been set.|Error: no local variable "region" has been set.]]
Operational Capacity Error: no local variable "cap" has been set.ktpa
Is site R1? Error: no local variable "r1" has been set.
When was R1 Granted? Error: no local variable "r1date" has been set.
What was the R1 value Error: no local variable "r1value" has been set.
Electrical Capacity Error: no local variable "mwe" has been set.MWe
Number of Lines Error: no local variable "line" has been set.
Number of Turbines Error: no local variable "turbine" has been set.
CHP Error: no local variable "chp" has been set.
Technology Approach Error: no local variable "techtype" has been set.
Funding Type [[Error: no local variable "funding" has been set.]]

Operators Annual Report


Input Data

Year HH C&I Clin RDF Total


Output Data

Year IBA IBA %ge of Tot IN APC APC %ge of Tot IN

Elevation of Coatbridge MRF and EfW Facility from their website
Elevation of Coatbridge MRF and EfW Facility from their website


Summary

An EfW facility based upon Gasification technology. Shore Energy envisaged an RDF production facility adjacent to the EfW facility on the site.

Technology

The plant was originally based on Chinook's RODECS Gasification technology, a subsequent planning application was made in partnership with Cogen for an alternative approach.

Construction

The planning application for the new larger approach was refused on appeal in November 2020 and it appears that the project will now not progress[1], although the original planning consent is understood to be extant[2].

Waste Input

The overall facility was designed to run on 160,000 tonnes per annum, with the new application designed for 204,000 tonnes per annum (on a dry basis). The EfW facility designed to run on RDF and SRF delivered as prepared fuel, or prepared in an adjacent fuel processing facility.

References