Baddersley EfW

From Wikiwaste
Revision as of 11:34, 21 February 2020 by MCWaste (talk | contribs)


Error: no local variable "site" has been set.
Error: no local variable "status" has been set.
Site Location
Site Location

See Residual EfW → page for a larger UK Wide map.

Waste Licence Error: no local variable "epr" has been set.
Operator [[Error: no local variable "operator" has been set.]]
Region [[:Category:Error: no local variable "region" has been set.|Error: no local variable "region" has been set.]]
Operational Capacity Error: no local variable "cap" has been set.ktpa
Is site R1? Error: no local variable "r1" has been set.
When was R1 Granted? Error: no local variable "r1date" has been set.
What was the R1 value Error: no local variable "r1value" has been set.
Electrical Capacity Error: no local variable "mwe" has been set.MWe
Number of Lines Error: no local variable "line" has been set.
Number of Turbines Error: no local variable "turbine" has been set.
CHP Error: no local variable "chp" has been set.
Technology Approach Error: no local variable "techtype" has been set.
Funding Type [[Error: no local variable "funding" has been set.]]

Operators Annual Report


Input Data

Year HH C&I Clin RDF Total


Output Data

Year IBA IBA %ge of Tot IN APC APC %ge of Tot IN

Summary

An EfW facility based upon conventional combustion technology, located within the Merevale and Blyth Estate near Atherstone in Warwickshire. The facility is forecasted to have a maximum capacity of 130,000 tonnes per annum, and to export 8.74 MW electricity to the grid after the facilities own power needs are met. The site will be CHP-ready with the potential to export hot water to a third party[1].

The facility has been developed by Aeternis Energy and Park Top, together known as Aeternis Baddesley as a joint venture. Funding has been provided by Equitix, totaling an investment of £61 m. The plant will be operated by Kantor Energy, who will also provide the EPC services[2].

Technology

The combustion technology in the plant will be furnace technology comprising of a single line Moving Grate Furnace[1]. Vyncke will supply the plant’s boiler and flue gas cleaning system, and the plants steam turbine will be provided by Triveni[2].

Construction

The EPC contractor for the facility is Kantor Energy.

Waste Input

The feedstock will be refuse derived fuel (RDF) that has been pre-treated by off-site suppliers and has an average Net Calorific Value of 11.5 MJ/kg[1], as well as waste wood and commercial and industrial waste supplied by Mick George[2].

References