Tyrone Energy

From Wikiwaste
Revision as of 09:30, 2 April 2020 by Bin52 (talk | contribs) (add page specific text)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Tyrone Energy Waste Wood EFW
Tyrone Energy Waste Wood EFW




Summary

A Biomass Waste EFW facility based on 25,000 tonnes per annum of Wood Waste generating 2.7MWe to the grid[1].

The Tyronne site was developed by Tyrone Energy Ltd and was operational in late 2014 and at the time was the first large scale EfW plant in Northern Ireland. It is located near Strabane, County Tyrone[2].

Plant

Built at a cost of £9.5m, the combustion technology is based on a standard stepped grate and is WID complaint.

Local Authority Users

The following data comes from WasteDataFlow for the financial year 2018/19 and represents those local authorities recorded as putting tonnage into the site (either directly or via a transfer station). The tonnage received cannot be directly compared with the stated historical tonnage received and recorded in the EA statistics as these are recorded on a calendar year basis (i.e. January 2018 to December 2018). A 'zero return' below indicates no local authority tonnage was recorded, most likely a result of the plant being recently commissioned and actually having received no tonnage. Equally, lower than expected tonnage maybe a result of either a new plant being in 'ramp up' towards full capacity after construction, or may be a result of plant shut down and subsequent re-start in a year.

data link to be added

References