Barry Dock – Biomass No 2
Error: no local variable "site" has been set. Error: no local variable "status" has been set. | |
See Biomass EfW → page for a larger UK Wide map. | |
Operator | Error: no local variable "operator" has been set. |
Capacity | Error: no local variable "capacity" has been set. MWe |
Feedstock | Error: no local variable "mainfeed" has been set. |
EPR (Waste Licence) | Error: no local variable "epr" has been set. |
ROC | Error: no local variable "roc" has been set. |
CfD | Error: no local variable "cfdcap" has been set. |
CHP | Error: no local variable "chp" has been set. |
Operators Annual Report
Input Data
Year | Wood | Litter | RDF | Other | Total |
---|
Output Data
Year | IBA | IBA %ge of Tot IN | APC | APC %ge of Tot IN |
---|
Summary
A Biomass Waste EFW facility based on 86,000 tonnes per annum of Wood Waste generating 10MWe to be exported to the local grid. The facility is located off Woodham Road, Barry, Vale of Glamorgan. The waste wood feedstock consumed at this facility comes from a variety of sources including municipal recycling centres and manufacturing companies[1].
Construction of this facility began in 2016 and entered the commissioning stage in 2019, becoming fully operational in 2020[1].
Operations are carried out by Barry Biomass, which is fully monitored by Natural Resources Wales (NRW)[2].
Plant
The facility is owned by an investment fund managed and financed by Aviva Investors[2]
Gasification technology is implemented to recover energy[2].
Local Authority Users
References
- ↑ 1.0 1.1 Lets Recycle, 2020. Barry Biomass Undergoing Final Tests - Letsrecycle.com. Online. [Accessed 3 April 2020.]
- ↑ 2.0 2.1 2.2 Barry Biomass, 2020. Welcome To Barry Biomass. Online. Barry Biomass. [Accessed 3 April 2020]