Welland Bio Power

From Wikiwaste
Revision as of 15:44, 7 April 2020 by MCWaste (talk | contribs)


Error: no local variable "site" has been set.
Error: no local variable "status" has been set.
Site Location
Site Location

See Biomass EfW → page for a larger UK Wide map.

Operator Error: no local variable "operator" has been set.
Capacity Error: no local variable "capacity" has been set. MWe
Feedstock Error: no local variable "mainfeed" has been set.
EPR (Waste Licence) Error: no local variable "epr" has been set.
ROC Error: no local variable "roc" has been set.
CfD Error: no local variable "cfdcap" has been set.
CHP Error: no local variable "chp" has been set.

Operators Annual Report


Input Data

Year Wood Litter RDF Other Total


Output Data

Year IBA IBA %ge of Tot IN APC APC %ge of Tot IN

Welland Bio Power. CoGen, 2018.
Welland Bio Power. CoGen, 2018.







Summary

A Biomass EfW facility based on 72,000 tonnes per annum of waste wood producing 10.6 MWe gross power to be exported to the national grid after the facility’s own energy requirements are met[1].

The facility is located in near Theddingworth in Northamptonshire. The waste wood feedstock is sourced locally through a feedstock contract with Welland Waste Management’s adjacent waste timber processing facility[1].

Welland Bio Power is operated by Nexterra and was developed by CoGen in partnership with Welland Waste Management Limited. CoGen continues to provide management services[1].

Plant

The facility utilises is Nexterra’s fixed-bed updraft gasification system techology, which is an Advanced Conversion Technology. MWH Treatment provided EPC services for the project[2].

The facility cost £51.6 million to develop and was financed by Balfour Beatty Investments, NOY Nexterra Holdings Limited Partnership (a partnership between NOY Infrastructure Fund and Nexterra) and Equitix MA Infrastructure Fund[2].

The facility replicates its sister project Birmingham Bio Power.

Local Authority Users

References