Error: no local variable "site" has been set.
Error: no local variable "status" has been set.
Site Location
Site Location

See Biomass EfW → page for a larger UK Wide map.

Operator Error: no local variable "operator" has been set.
Capacity Error: no local variable "capacity" has been set. MWe
Feedstock Error: no local variable "mainfeed" has been set.
EPR (Waste Licence) Error: no local variable "epr" has been set.
ROC Error: no local variable "roc" has been set.
CfD Error: no local variable "cfdcap" has been set.
CHP Error: no local variable "chp" has been set.

Operators Annual Report


Input Data

Year Wood Litter RDF Other Total


Output Data

Year IBA IBA %ge of Tot IN APC APC %ge of Tot IN

Tansterne
Tansterne


Summary

A Biomass Waste EFW facility located in Tansterne near Hull which is based on c.150,000 tonnes per annum of waste wood generating 22MW of electricity to the grid[1].

It was funded and developed by Irish renerwable energy company Solar 21 in partnership with Heat Recovery Solutions (HRS) Ltd[2]. The plant became fully operational in February 2018. The cost of the project was an estimated £35m[3].

In 2016 Probio Energy International won the contract to be sole supplier of the waste wood to the facility[4].

Plant

The biomass power plant utilises a fluidised bed combustion, heat recovery and power module technology developed by HRS, a subsidiary HRS Energy Ltd which was manufactured in Hull by project partner CF Struthers, the sister company to HRS Energy[5].

In September 2019 the O&M contractor HRS Energy Tansterne Ltd (HRSET) went into administration. HRSET had originally held the O&M contract until it expired on 01/09/73. The plant is now owner-operated by GIB-Bio Ltd which is a subsidiary of Solar 21, the owners of the facility[1].

Refernces