Markley Group Biomass

From Wikiwaste
Revision as of 13:12, 16 April 2020 by Northern Chick (talk | contribs) (New text)


Markley Group Biomass
Operational
Site Location
Site Location

See Biomass EfW → page for a larger UK Wide map.

Operator Markley Group (Premiere Kitchens)
Capacity 2.1 MWe
Feedstock Waste Wood
EPR (Waste Licence)
ROC No
CfD
CHP Unkwn

Operators Annual Report


Input Data

Year Wood Litter RDF Other Total


Output Data

Year IBA IBA %ge of Tot IN APC APC %ge of Tot IN

Markley Group Biomass
Markley Group Biomass


Summary

A biomass EFW located at Markey Group premises in Hardwicke, Gloucestershire which generates 2.1MW from c. 2,300 tonnes of waste wood from its commercial business[1].

In 2012, Gloucester based Markey Group opened a £1.1m biomass facility which runs on waste wood generated by the subsidiary of Markey Group, Premiere Kitchens[1]. Each year Premiere Kitchens creates approximately 2,350 tonnes of waste wood in the form of extracted chipboard dust and residual off-cuts, which is used in the plant to generate all of the heating and hot water required for the company's site at Herdwicke[1].

Plant

The plant was commissioned by UK-based Indusvent Limited; the system features a 2.1 MW hot water boiler manufactured by Danish based Justsen Energiteknik A/S[1]. the burning of the waste wood in the boiler is controlled automatically to maximise efficiency with results monitored both on site and at the manufacturers premises in Denmark[1].

References