Lancing Biomass Plant
| Error: no local variable "site" has been set. Error: no local variable "status" has been set. | |
See Biomass EfW → page for a larger UK Wide map. | |
| Operator | Error: no local variable "operator" has been set. |
| Capacity | Error: no local variable "capacity" has been set. MWe |
| Feedstock | Error: no local variable "mainfeed" has been set. |
| EPR (Waste Licence) | Error: no local variable "epr" has been set. |
| ROC | Error: no local variable "roc" has been set. |
| CfD | Error: no local variable "cfdcap" has been set. |
| CHP | Error: no local variable "chp" has been set. |
Operators Annual Report
Input Data
| Year | Wood | Litter | RDF | Other | Total |
|---|
Output Data
| Year | IBA | IBA %ge of Tot IN | APC | APC %ge of Tot IN |
|---|
Summary
A Biomass EfW facility based on 40,000 tonnes per annum of waste wood producing 5 MW of electricity to be exported to the national grid. The facility is located in Lancing in West Sussex. The feedstock that is accepted at the facility includes wood, paper and organic-based construction and demolition waste[1]
The Lancing biomass plant began construction in 2007 and became operational in 2008. The facility is operated and was developed by Rabbit Waste Management Ltd[2]
Plant
The facility cost £10m to develop[1] and is collocated with recycling operations[2].