Lancing Biomass Plant Operational | |
See Biomass EfW → page for a larger UK Wide map. | |
Operator | Enviropower Ltd |
Capacity | 5.1 MWe |
Feedstock | Waste Wood |
EPR (Waste Licence) | XP3030XX |
ROC | Yes |
CfD | |
CHP | No |
Operators Annual Report
Input Data
Year | Wood | Litter | RDF | Other | Total |
---|
Output Data
Year | IBA | IBA %ge of Tot IN | APC | APC %ge of Tot IN |
---|
Summary
A Biomass EfW facility based on consuming 40,000 tonnes per annum of mainly waste wood feedstock to produce 5 MW of electricity to be exported to the national grid. The facility is located in Lancing in West Sussex. The feedstock that is accepted at the facility includes wood, paper and organic-based construction and demolition waste[1].
The Lancing biomass plant began construction in 2007 and became operational in 2008. The facility is operated and was developed by Rabbit Waste Management Ltd[2].
Plant
The facility cost £10m to develop[1] and is collocated with recycling operations[2].