Lisahally Power Station
Error: no local variable "site" has been set. Error: no local variable "status" has been set. | |
See Biomass EfW → page for a larger UK Wide map. | |
Operator | Error: no local variable "operator" has been set. |
Capacity | Error: no local variable "capacity" has been set. MWe |
Feedstock | Error: no local variable "mainfeed" has been set. |
EPR (Waste Licence) | Error: no local variable "epr" has been set. |
ROC | Error: no local variable "roc" has been set. |
CfD | Error: no local variable "cfdcap" has been set. |
CHP | Error: no local variable "chp" has been set. |
Operators Annual Report
Input Data
Year | Wood | Litter | RDF | Other | Total |
---|
Output Data
Year | IBA | IBA %ge of Tot IN | APC | APC %ge of Tot IN |
---|
Summary
A Combined Heat and Power Biomass EfW facility based on 110,000 tonnes per annum of waste wood producing 15.8 MW of electricity and 6 MW of heat. The facility is located in Derry in Northern Ireland[1]. The feedstock is supplied locally under a long-term fuel contract with Stobart Biomass Products Limited and the energy generated is purchased under a long-term contact with Power NI[2].
The facility was developed by Evermore Energy (ERE Developments Limited), and is operated by Burmeister Wain Scandinavian Contractor (BWSC), who also provided turnkey EPC services for this facility. Operations started at the end of 2015 after construction began in mid-2013[1].
This facility was the first biomass fired power station to be developed in Northern Ireland and remains the largest[3].
Plant
The facility is owned by cost £83m to develop, which was provided by investors Investec, UK Green Investment Bank, Gravis, and EKF[1].
The boiler technology implemented at the facility was supplied by Weiss Kessel-Anlagen-und Maschinenbau GmbH[1].
Local Authority Users
References
- ↑ 1.0 1.1 1.2 1.3 BWSC, 2020. Lisahally Biomass Plant. Online. Bwsc.com. [Accessed 20 April 2020.]
- ↑ Evermore Energy, 2020. Home - Evermore Energy. Lisahally Biomass CHP Plant. Online. Evermore Energy. [Accessed 20 April 2020.]
- ↑ Fichtner, 2020. Project | Lisahally Biomass CHP - Evermore Renewable Energy / Investec | Fichtner. Online. Fichtner Ireland. [Accessed 20 April 2020.]