BSW Timber
BSW Timber Operational | |
See Biomass EfW → page for a larger UK Wide map. | |
Operator | BSW Timber |
Capacity | 3.2 MWe |
Feedstock | Waste Wood |
EPR (Waste Licence) | 1448 |
ROC | No |
CfD | |
CHP | Yes |
Operators Annual Report
Input Data
Year | Wood | Litter | RDF | Other | Total |
---|
Output Data
Year | IBA | IBA %ge of Tot IN | APC | APC %ge of Tot IN |
---|
Summary
A Biomass Waste combined heat and power (CHP) EFW facility utilising Wood Waste to generate 3.2 MW. The facility is located at the BSW sawmill in Carlisle. The electricity generated is used in the sawmill production process and the heat is utilised in the kilns, treatment plant, and offices[2].
This facility was developed in partnership with Dallol Energy[2], and became operational in 2016[3].
Plant
The facility cost £2.5 million to develop and is part of BSW’s £11 million investment programme for biomass energy facilities at its mills in the UK and Latvia[2].
Tonnage Input/Fuel
The tonnage received by the plant is not reported in the most recent Annual Sustainability Report for 2018-19[4] by Ofgem or the SEPA data for the calendar year (i.e. January 2018 to December 2018).
References
- ↑ BSW Timber Biomass Site PhotoAll Rights Reserved
- ↑ 2.0 2.1 2.2 BSW Timber, 2016. BSW Timber Fires Up £2.5M Biomass Boiler At Carlisle Sawmill. BSW Timber. Online. Bsw.co.uk.[Accessed 6 April 2020].
- ↑ Les Prom, 2016. BSW Timber Commissions Biomass Boiler At Its Carlisle Sawmill In The UK. Online. Lesprom.com. [Accessed 6 April 2020].
- ↑ Biomass Sustainability Dataset 2018-19