Inert Landfill
An Inert Landfill can only accept Inert Waste that meets the Directive definition of inert (Article 2(e)) and the relevant Waste Acceptance Criteria (WAC). WAC for Inert Waste is set out in paragraph 2.1 of the Annex to the EU Council Decision (1999/31/EC)[1]. The Decision provides a list of Inert Waste that can be accepted without testing where there is confidence that the waste is not contaminated, all other Inert Waste must be tested to demonstrate that they meet the leaching limit values given in the Decision for Landfill in an Inert Landfill[2].
Capacity Inert Landfill
The capacity of Inert Landfill is reported[3] by the EA for England and is summarised in the graph and table below:
<graph>{
"width":400, "height":200, "data":[{ "name":"table", "values":[ {"x":2015,"y":132.6},{"x":2016,"y":147.8},{"x":2017,"y":125.2}, {"x":2018,"y":124.5},{"x":2019,"y":122.4} ] }], "scales": [ { "name": "x", "type": "linear", "range": "width", "zero": false, "domain": {"data": "table", "field": "x"} }, { "name": "y", "type": "linear", "range": "height", "nice": true, "domain": {"data": "table", "field": "y"} } ], "axes": [ {"type": "x", "scale": "x", "format":"d","title":"Year"}, {"type": "y", "scale": "y", "grid":true, "title":"Million Cubic Metres"} ], "marks": [ { "type": "line", "from": {"data": "table"}, "properties": { "enter": { "x": {"scale": "x", "field": "x"}, "y": {"scale": "y", "field": "y"}, "stroke": {"value": "steelblue"}, "strokeWidth":{"value":2} } } }, { "type": "symbol", "from": {"data": "table"}, "properties": { "enter": { "x": {"scale":"x","field": "x"}, "y": {"scale":"y","field": "y"}, "fill": {"value": "steelblue"}, "size":{"value":15} } } } ] }</graph> |
Year | 2015 | 2016 | 2017 | 2018 | 2019 |
Million Cubic Metres | 132.6 | 147.8 | 125.2 | 124.5 | 122.4 |
References
- ↑ EU Council Decision (2003/33/EC) establishing criteria and procedures for the acceptance of waste at landfills pursuant to Art 16 of and Annex II to Directive 1999/31/EC
- ↑ Defra, 2010. Environmental Permitting Guidance: The Landfill Directive for the Environmental Permitting (England and Wales) Regulations 2010. London: Department for Environment, Food and Rural Affairs, p.7.
- ↑ EA Remaining Landfill Capacity