Hooton Bio Power
Error: no local variable "site" has been set. Error: no local variable "status" has been set. | |
See Residual EfW → page for a larger UK Wide map. | |
Waste Licence | Error: no local variable "epr" has been set. |
Operator | [[Error: no local variable "operator" has been set.]] |
Region | [[:Category:Error: no local variable "region" has been set.|Error: no local variable "region" has been set.]] |
Operational Capacity | Error: no local variable "cap" has been set.ktpa |
Is site R1? | Error: no local variable "r1" has been set. |
When was R1 Granted? | Error: no local variable "r1date" has been set. |
What was the R1 value | Error: no local variable "r1value" has been set. |
Electrical Capacity | Error: no local variable "mwe" has been set.MWe |
Number of Lines | Error: no local variable "line" has been set. |
Number of Turbines | Error: no local variable "turbine" has been set. |
CHP | Error: no local variable "chp" has been set. |
Technology Approach | Error: no local variable "techtype" has been set. |
Funding Type | [[Error: no local variable "funding" has been set.]] |
Operators Annual Report
Input Data
Year | HH | C&I | Clin | RDF | Total |
---|
Output Data
Year | IBA | IBA %ge of Tot IN | APC | APC %ge of Tot IN |
---|
Summary
Hooton Bio Power is an EfW facility currently under construction in Ellesmere Port, Cheshire. The facility will utilize Advanced Conversion Technologies to process 240,000 tonnes per annum and generate 25.2 MW of electricity which will be exported to the grid after the facility’s own power needs are met. The facility has been developed by CoGen with BWSC as the turnkey EPC contractor and O&M provider. In 2018, the facility was sold to Aviva Investors[1].
History
The project reached financial close in October 2018, with BWSC beginning construction in November 2018. Construction and commissioning is scheduled to end with operations commencing in the second half of 2021[2].
Plant
The facility will utilize 2 lines of a Fluidised Bed Gasification system provided by Kobelco Eco Solutions. CoGen will continue to be involved in the project’s delivery through long-term Management Service Agreements (MSA)[1].
The Hooton Bio Power facility will be the first non-subsidized merchant Gasification facility in the UK, and the largest Gasification facility in the UK of its size and technology type[3].
Waste Input
The waste aggregator N+P will supply the waste for the facility, providing locally-sourced waste under a 15-year feedstock supply agreement[1].
References
- ↑ 1.0 1.1 1.2 CoGen, 2018. Projects — CoGen. Online. CoGen. [Accessed 14 Feb. 2020.]
- ↑ Lets Recycle, 2018. Construction starts at Hooton gasification plant. Online. letsrecycle.com. [Accessed 14 Feb. 2020.]
- ↑ BWSC, 2018. BWSC awarded deal to deliver UKs largest gasification plant – Hooton Bio Power Resource Recovery Centre Project. Online. Bwsc.com. [Accessed 14 Feb. 2020.]