Binn Eco Park EFW
Error: no local variable "site" has been set. Error: no local variable "status" has been set. | |
See Residual EfW → page for a larger UK Wide map. | |
Waste Licence | Error: no local variable "epr" has been set. |
Operator | [[Error: no local variable "operator" has been set.]] |
Region | [[:Category:Error: no local variable "region" has been set.|Error: no local variable "region" has been set.]] |
Operational Capacity | Error: no local variable "cap" has been set.ktpa |
Is site R1? | Error: no local variable "r1" has been set. |
When was R1 Granted? | Error: no local variable "r1date" has been set. |
What was the R1 value | Error: no local variable "r1value" has been set. |
Electrical Capacity | Error: no local variable "mwe" has been set.MWe |
Number of Lines | Error: no local variable "line" has been set. |
Number of Turbines | Error: no local variable "turbine" has been set. |
CHP | Error: no local variable "chp" has been set. |
Technology Approach | Error: no local variable "techtype" has been set. |
Funding Type | [[Error: no local variable "funding" has been set.]] |
Operators Annual Report
Input Data
Year | HH | C&I | Clin | RDF | Total |
---|
Output Data
Year | IBA | IBA %ge of Tot IN | APC | APC %ge of Tot IN |
---|
Summary
An EfW facility based upon conventional combustion technology that was granted planning permission in December 2020 and has a permitted capacity of 84,900 tonnes per annum. This consent replaced an earlier consent for a gasification technology with a capacity of 60,000 tonnes per annum.
The site is part of the wider activity at Binn Eco Park, near Perth, Scotland, owned by the Binn Group, and investment has been agreed for the facility with Iona Capital[1].
Technology
The plant technology will comprise standard moving grate technology, with an operational capacity of 89,00 tonnes per annum, generating 8.6MWe with 7.3MWe net for export.
Construction
The plant gained planning permission in December 2020. Construction is reported to commence in 2021 with operational handover in 2024. Earlier reports were the project would cost £70 million to deliver[2]
Waste Input
The plant is intended to run on residual Household Waste and Commercial Waste from the adjacent processing facilities on the site.