Runcorn EfW

From Wikiwaste
Revision as of 15:11, 31 March 2021 by Bin52 (talk | contribs) (page layout)

One of the largest ERF facilities in the UK, Runcorn EfW has a permitted operational capacity of 1,100,000 tonnes per annum and is operated by Viridor and owned by Viridor and Ineous Chlor. Delivery of waste is by both road and rail and the facility processes both residual Household Waste and Commercial Waste in the form of RDF[1]


Error: no local variable "site" has been set.
Error: no local variable "status" has been set.
Site Location
Site Location

See Residual EfW → page for a larger UK Wide map.

Waste Licence Error: no local variable "epr" has been set.
Operator [[Error: no local variable "operator" has been set.]]
Region [[:Category:Error: no local variable "region" has been set.|Error: no local variable "region" has been set.]]
Operational Capacity Error: no local variable "cap" has been set.ktpa
Is site R1? Error: no local variable "r1" has been set.
When was R1 Granted? Error: no local variable "r1date" has been set.
What was the R1 value Error: no local variable "r1value" has been set.
Electrical Capacity Error: no local variable "mwe" has been set.MWe
Number of Lines Error: no local variable "line" has been set.
Number of Turbines Error: no local variable "turbine" has been set.
CHP Error: no local variable "chp" has been set.
Technology Approach Error: no local variable "techtype" has been set.
Funding Type [[Error: no local variable "funding" has been set.]]

Operators Annual Report


Input Data

Year HH C&I Clin RDF Total


Output Data

Year IBA IBA %ge of Tot IN APC APC %ge of Tot IN

Runcorn 1&2 ERF
Runcorn 1&2 ERF

[2]


Summary

One of the largest ERF facilities in the UK, Runcorn EfW has a permitted operational capacity of 1,100,000 tonnes per annum and is operated by Viridor and owned by Viridor and Ineous Chlor. Delivery of waste is by both road and rail and the facility processes both residual Household Waste and Commercial Waste in the form of RDF[1]

History

The Runcorn facility was built in two phases with 425,000 tonnes per annum capacity in each phase. The initial capacity focused on the solution delivered as part of the PFI for GMWDA (Greater Manchester Waste Disposal Authority, now Greater Manchester Combined Authority) and was then subsequently extended to deliver a capacity of 1,100,000 tonnes per annum to reflect the lower Calorific Value of the fuel delivered than was anticipated in the design for 850,000 tonnes per annum. The facility is a CHP plant, located on Ineous Chlor's site in Runcorn, generating 83MWe of electricity (design point vs 100MWe listed capacity) and 51MWth of heat for the adjacent chemical manufacturing site

Plant

Built by Keppel Seghers under a Design & Build EPC-turnkey contract. Phase 1 commenced in 2009 and was handed over in January 2015, and phase 2 commenced in 2010 and handed over in April 2015 at a contract value of GBP £390 million [3]. The plant comprises 4 lines (2 in each phase) of standard combustion technology comprising Keppel Segher's proprietary water-cooled grates, generating super-heated steam, and is configured to run on RDF with a 'design point' CV of 11.5MJ/kg

Local Authority Data

Local Authority Data

The table below lists those local authorities who have recorded their tonnage on WasteDataFlow as sending their Waste to this site (either directly or via a transfer station) for the most recent financial year, data was updated on Error: no local variable "updated" has been set.. The tonnage received cannot be directly compared with the stated historical tonnage received and recorded in the EA statistics as these are recorded on a calendar year basis (i.e. January 2018 to December 2018). The total Local Authority waste received by the plant in the period was: 0t

A 'zero return' or a below expected return, when compared to the EA Data below indicates that either:

  • no local authority tonnage was recorded/no tonnage was sent to the site in the period (but has been listed as it may have previously received tonnage from a local authority) or
  • a result of the plant being recently commissioned and actually having received no tonnage or
  • a lower than expected tonnage maybe a result of a local authority splitting their tonnage over multiple sites, having less tonnage to send than might be anticipated or
  • it may be a new plant being in 'ramp up' towards full capacity after construction or
  • may be a result of plant shut down and subsequent re-start in a year or
  • the local authority may not have correctly entered the site's details on WasteDataFlow


Authority Tonnage

References