Wrexham Clinical Waste Incinerator

From Wikiwaste
Revision as of 08:05, 16 June 2021 by Admin (talk | contribs) (Admin moved page TradeBe Wrexham to Wrexham Clinical Waste Incinerator: change of name to reflect name of site)

Clinical Waste Incinerator operated by Tradebe Healthcare National Ltd and located in Wrexham, with an annual capacity of c. 8,000 tonnes.


Wrexham Clinical Waste Incinerator
Site Location
Site Location

See HT & Clin → page for a larger UK Wide map.

Waste Licence WP3836ZF
Operator Tradebe
Operational Capacity 8,000tpa
Number of Lines 1
Region Wales

Annual Report Data

Year Total In Total Clinical IBA Out ACP Out Op Hours

2019 5605 5605 458 86
2018
2017
2020 0 0 0 0 0
2021 5124 5124 761 317 0
2022 4738 4738 840 351 0


Wrexham Clinical Incinerator, Tradebe, Captured from Google Earth June 21, all rights reserved
Wrexham Clinical Incinerator, Tradebe, Captured from Google Earth June 21, all rights reserved


Summary

Clinical Waste Incinerator operated by Tradebe Healthcare National Ltd and located in Wrexham, with an annual capacity of c. 8,000 tonnes.

Plant[1]

Text to follow

The query SELECT "updated" FROM "db_ea"."ea_ew_in" WHERE epr='WP3836ZF' LIMIT 1 is invalid (Error : SSL SYSCALL error: EOF detected

Function: EDConnectorRdbms::fetch Query: SELECT "updated" FROM "db_ea"."ea_ew_in" WHERE epr='WP3836ZF' LIMIT 1 ).Error: Could not connect to database (Cannot access the database: Unable to connect to PostgreSQL server: connection to server at "10.106.0.2", port 5432 failed: FATAL: the database system is in recovery mode).The query SELECT "ewc","origin","tin" FROM "db_ea"."ea_ew_in" WHERE epr='WP3836ZF' is invalid (Error : SSL SYSCALL error: EOF detected

Function: EDConnectorRdbms::fetch Query: SELECT "ewc","origin","tin" FROM "db_ea"."ea_ew_in" WHERE epr='WP3836ZF' ).

Waste Tonnage, By Origin

The table shows a list of the Waste for the Permit WP3836ZF, that has arrived into sites as reported to the Regulator and then publicised in their reported statistics. The Data used is from the most recent returns. The total reported tonnage arriving at the site was: Expression error: Unexpected < operator.t.

Where this tonnage exceeds that reported in year of the corresponding annual report, this may be due to the following reasons:

  • Tonnage may have been received but not incinerated, i.e. the material is held pending incineration (the operator return to the EA reports as received whereas the annual report focuses on when the waste is incinerated.)
  • Material may have been received into the site but treated in some other way than incineration.
  • Material may have been received on the but transferred out of site for disposal/treatment at another site rather than incineration on the site.
EWC Code Origin of Waste Tonnes In


References

  1. Annual Performance Report 2020