Bournemouth Waste To Energy Facility

From Wikiwaste
Revision as of 13:27, 24 June 2021 by Northern Chick (talk | contribs) (new text)

Clinical Waste Incinerator operated by Stericycle SRCL and located adjacent to Royal Bournemouth Hospital in Bournemouth.


Bournemouth Waste To Energy Facility
Site Location
Site Location

See HT & Clin → page for a larger UK Wide map.

Waste Licence PP3530XK
Operator SRCL
Operational Capacity 8,000tpa
Number of Lines 1
Region South West

Annual Report Data

Year Total In Total Clinical IBA Out ACP Out Op Hours

2019 6988 6988 1459 640 8234
2018
2017
2020 6998 6998 1278 576 8177
2021 5162 5162 1080 351 6524
2022 6028 6028 962 566 7217


Bournemouth Clinical Incinerator, SRCL, Captured from Google Street View in June 21, all rights reserved
Bournemouth Clinical Incinerator, SRCL, Captured from Google Street View in June 21, all rights reserved


Summary

Clinical Waste Incinerator operated by Stericycle SRCL and located adjacent to Royal Bournemouth Hospital in Bournemouth. The plant incinerates clinical waste, including clinical wastes classed as hazardous under theHazardous Waste (England and Wales) Regulations 2005. The bulk of the waste is produced at hospitals, but also includes smaller quantities from doctors’ surgeries, dentists, health clinics, residential and nursing homes, and from medical research facilities. The hazardous wastes incinerated include infectious waste and waste containing cytotoxic or cytostatic medicines[1].

Plant[2]

Text to follow

The query SELECT "updated" FROM "db_ea"."ea_ew_in" WHERE epr='PP3530XK' LIMIT 1 is invalid (Error : SSL SYSCALL error: EOF detected

Function: EDConnectorRdbms::fetch Query: SELECT "updated" FROM "db_ea"."ea_ew_in" WHERE epr='PP3530XK' LIMIT 1 ).Error: Could not connect to database (Cannot access the database: Unable to connect to PostgreSQL server: connection to server at "10.106.0.2", port 5432 failed: FATAL: the database system is in recovery mode).Error: Could not connect to database (Cannot access the database: Unable to connect to PostgreSQL server: connection to server at "10.106.0.2", port 5432 failed: FATAL: the database system is in recovery mode).

Waste Tonnage, By Origin

The table shows a list of the Waste for the Permit PP3530XK, that has arrived into sites as reported to the Regulator and then publicised in their reported statistics. The Data used is from the most recent returns. The total reported tonnage arriving at the site was: Expression error: Unexpected < operator.t.

Where this tonnage exceeds that reported in year of the corresponding annual report, this may be due to the following reasons:

  • Tonnage may have been received but not incinerated, i.e. the material is held pending incineration (the operator return to the EA reports as received whereas the annual report focuses on when the waste is incinerated.)
  • Material may have been received into the site but treated in some other way than incineration.
  • Material may have been received on the but transferred out of site for disposal/treatment at another site rather than incineration on the site.
EWC Code Origin of Waste Tonnes In


References

  1. [Operators Annual Performance Report 2020]
  2. Annual Performance Report 2020