Kelvin Energy Recovery Facility

From Wikiwaste
Revision as of 10:42, 22 July 2022 by Bin52 (talk | contribs) (add page specific text)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)

An EfW facility based upon conventional combustion technology that was acquired by Enfinium from Verus (Energy Oak Ltd) in 2021 and presently in construction, having reached financial close in November 2021. It has a forecast operational capacity of 395,000 tonnes per annum.[1].

Error: no local variable "site" has been set.
Error: no local variable "status" has been set.
Site Location
Site Location

See Residual EfW → page for a larger UK Wide map.

Waste Licence Error: no local variable "epr" has been set.
Operator [[Error: no local variable "operator" has been set.]]
Region [[:Category:Error: no local variable "region" has been set.|Error: no local variable "region" has been set.]]
Operational Capacity Error: no local variable "cap" has been set.ktpa
Is site R1? Error: no local variable "r1" has been set.
When was R1 Granted? Error: no local variable "r1date" has been set.
What was the R1 value Error: no local variable "r1value" has been set.
Electrical Capacity Error: no local variable "mwe" has been set.MWe
Number of Lines Error: no local variable "line" has been set.
Number of Turbines Error: no local variable "turbine" has been set.
CHP Error: no local variable "chp" has been set.
Technology Approach Error: no local variable "techtype" has been set.
Funding Type [[Error: no local variable "funding" has been set.]]

Operators Annual Report


Input Data

Year HH C&I Clin RDF Total


Output Data

Year IBA IBA %ge of Tot IN APC APC %ge of Tot IN

Kelvin EFW, all rights reserved Enfinium
Kelvin EFW, all rights reserved Enfinium


Summary

An EfW facility based upon conventional combustion technology that was acquired by Enfinium from Verus (Energy Oak Ltd) in 2021 and presently in construction, having reached financial close in November 2021. It has a forecast operational capacity of 395,000 tonnes per annum (with a permitted maximum of 400,000 tonnes per annum).

Technology

The plant technology will comprise a single line of a standard moving grate technology, processing around 45 tonnes per hour of waste and producing super-heated steam and 39MWe gross, with a net export of 34MWe[2]

Construction

The plant is being constructed under an EPC contract with Acciona.

Waste Input

The plant is intended to run on residual Household Waste and Commercial Waste and RDF with 50% secured through a long term supply agreement with Suez, with further announcments of supply from Biffa and B&M in October 2021[3].

References