Blackburn Meadows Renewable Energy Plant
Error: no local variable "site" has been set. Error: no local variable "status" has been set. | |
See Biomass EfW → page for a larger UK Wide map. | |
Operator | Error: no local variable "operator" has been set. |
Capacity | Error: no local variable "capacity" has been set. MWe |
Feedstock | Error: no local variable "mainfeed" has been set. |
EPR (Waste Licence) | Error: no local variable "epr" has been set. |
ROC | Error: no local variable "roc" has been set. |
CfD | Error: no local variable "cfdcap" has been set. |
CHP | Error: no local variable "chp" has been set. |
Operators Annual Report
Input Data
Year | Wood | Litter | RDF | Other | Total |
---|---|---|---|---|---|
2017 | 202183 | 0 | 0 | 0 | 202183 |
2018 | 214135 | 0 | 0 | 0 | 214135 |
2019 | 200098 | 0 | 0 | 0 | 200098 |
2020 | 149665 | 0 | 0 | 0 | 149665 |
2021 | 207643 | 0 | 0 | 0 | 207643 |
2022 | 199548 | 0 | 0 | 0 | 199548 |
Output Data
Year | IBA | IBA %ge of Tot IN | APC | APC %ge of Tot IN |
---|---|---|---|---|
2017 | 4500 | 2.23% | 5265 | 2.60% |
2018 | 3636 | 1.70% | 5324 | 2.49% |
2019 | 4463 | 2.23% | 5116 | 2.56% |
2020 | 3580 | 2.39% | 3968 | 2.65% |
2021 | 4084 | 1.97% | 5267 | 2.54% |
2022 | 4669 | 2.34% | 5207 | 2.61% |
Summary
A Biomass Waste combined heat and power (CHP) EFW facility utilising a feedstock of Wood Waste to generate 29 MWe and up to 25 MWth. The facility is located on the site of the former Tinsley cooling towers in Sheffield, and the Wood Waste is sourced locally within a 50-mile of the plant. The generated electricity is exported to the national grid and the heat is supplied as hot water to local businesses through a district heating network, including the Sheffield Arena and Forgemaster Steel Works[2].
The Blackburn Meadows facility is operated by E.ON Energy and became operational in 2015 after beginning construction in 2011[3].
Plant
The facility had a 10 MW battery installed after it was awarded a contract to support the national grid’s stability requirements, which became operational in 2017[2].
The unique architectural work was undertaken by BDP, which includes an orange translucent clad boiler house that is internally illuminated[3].
The facility cost £120 million to develop[4]. It has an Andritz boiler.
Tonnage Input/Fuel
The tonnage received by the plant in the most recent Annual Sustainability Report for 2018-19[5] was reported by Ofgem as follows:
Biomass | Tonnage (2018-19) |
---|---|
Wood Waste | 208,327 |
Other | 0 |
Total | 208,327 |
The Wood Waste is received from a variety of sources. The Wood Waste tonnage received cannot be directly compared with the stated historical tonnage received and recorded in the EA statistics as these are recorded on a calendar year basis (i.e. January 2018 to December 2018) and was 214,135 tonnes.
References
- ↑ Blackburn Meadows CHP Site PhotoAll Rights Reserved
- ↑ 2.0 2.1 E.ON, 2020. Blackburn Meadows | Business Case Studies | E.ON. Online. Eonenergy.com. [Accessed 6 April 2020].
- ↑ 3.0 3.1 BDP., 2018. Blackburn Meadows Biomass Plant - BDP.Com. Online. Bdp.com. [Accessed 6 April 2020].
- ↑ Bioenergy Insight, 2014. E.ON's Blackburn Meadows Biomass Plant Generates Electricity. Online. Bioenergy Insight. [Accessed 6 April 2020].
- ↑ Biomass Sustainability Dataset 2018-19