Widnes Biomass Facility

From Wikiwaste
Revision as of 12:16, 9 August 2022 by Bin52 (talk | contribs) (Bin52 moved page Mersey Biomass Ltd to Widnes Biomass Facility: update database)


Error: no local variable "site" has been set.
Error: no local variable "status" has been set.
Site Location
Site Location

See Biomass EfW → page for a larger UK Wide map.

Operator Error: no local variable "operator" has been set.
Capacity Error: no local variable "capacity" has been set. MWe
Feedstock Error: no local variable "mainfeed" has been set.
EPR (Waste Licence) Error: no local variable "epr" has been set.
ROC Error: no local variable "roc" has been set.
CfD Error: no local variable "cfdcap" has been set.
CHP Error: no local variable "chp" has been set.

Operators Annual Report


Input Data

Year Wood Litter RDF Other Total
2017 19605 0 0 0 19605
2018 88077 0 0 0 88077
2019 129174 0 0 0 129174
2020 124624 0 0 0 124624
2021 143124 0 0 0 143124
2022 132199 0 0 0 132199


Output Data

Year IBA IBA %ge of Tot IN APC APC %ge of Tot IN
2017 664 3.39% 90 0.46%
2018 3529 4.01% 1668 1.89%
2019 4898 3.79% 2709 2.10%
2020 6466 5.19% 2864 2.30%
2021 8990 6.28% 3590 2.51%
2022 7637 5.78% 2978 2.25%


Summary

Plant

Tonnage Input/Fuel

References