Holbrook Community REC
A Biomass EfW facility Holbrook Community REC is based on up to 55,000 tonnes per annum of Wood Waste producing 6.5 MWe gross power to be exported to the national grid. This facility is a Combined Heat and Power (CHP) plant, enough heat is produced and harnessed to supply approximately 6,700 local homes and commercial properties.
Holbrook Community REC Operational | |
See Biomass EfW → page for a larger UK Wide map. | |
Operator | Equitex ESI CHP (Sheff.) Ltd |
Capacity | 6.3 MWe |
Feedstock | Waste Wood |
EPR (Waste Licence) | VP3737RS |
ROC | Yes |
CfD | |
CHP | Yes |
Operators Annual Report
Input Data
Year | Wood | Litter | RDF | Other | Total |
---|---|---|---|---|---|
2018 | 20530 | 0 | 0 | 0 | 20530 |
2019 | 31798 | 0 | 0 | 0 | 31798 |
2020 | 31202 | 0 | 0 | 0 | 31202 |
2021 | 48716 | 0 | 0 | 0 | 48716 |
2022 | 29820 | 0 | 0 | 0 | 29820 |
Output Data
Year | IBA | IBA %ge of Tot IN | APC | APC %ge of Tot IN |
---|---|---|---|---|
2018 | 356 | 1.73% | 312 | 1.52% |
2019 | 826 | 2.60% | 538 | 1.69% |
2020 | 911 | 2.92% | 287 | 0.92% |
2021 | 1153 | 2.37% | 910 | 1.87% |
2022 | 647 | 2.17% | 616 | 2.06% |
Summary
A Biomass EfW facility Holbrook Community REC is based on up to 55,000 tonnes per annum of Wood Waste producing 6.5 MWe gross power to be exported to the national grid. This facility is a Combined Heat and Power (CHP) plant, enough heat is produced and harnessed to supply approximately 6,700 local homes and commercial properties. Holbrook Community Renewable Energy Centre is located in Sheffield[2].
The Wood Waste feedstock is locally supplied by Mid UK Recycling. The operator of this facility is Veolia Energy Services Ltd[2].
Plant
The Design and Build EPC contractor for this development was Kandor Energy Ltd[3].
The facility cost £30m to develop and became operational in 2017[4]
The technology utilised in this facility is two water-cooled moving grate furnaces that are supplied by Turboden Srl (part of the Mitsubishi Heavy Industries Group). Turboden Srl also supplied the ‘organic rankin cycle’ (ORC) turbogenerators with air condensers for the facility which uses ‘organic fluid’ vapour as the driving force for the turbine within a closed loop heating circuit[2].
Annual Sustainability Tonnage Input/Fuel
The tonnage[5] received by the plant in the most recent Annual Sustainability Report and for the previous 3 years for 2020/21 was reported by Ofgem as below[6]:
Year | Waste Wood (m3) | Waste Wood (t) | Straw | Miscanthus | Arboricultrual Waste | Sawmill Residue | Foresrty Residue | Round Wood | Short Rotation Coppice | MBM | Other Material |
---|---|---|---|---|---|---|---|---|---|---|---|
2020/21 | 0 | 32414 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
2019/20 | 0 | 35579 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
2018/19 | 0 | 21188 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
2017/18 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
The query SELECT "updated" FROM "db_ea"."ea_ew_in" WHERE epr='VP3737RS' LIMIT 1 is invalid (Error : SSL SYSCALL error: EOF detected
Function: EDConnectorRdbms::fetch Query: SELECT "updated" FROM "db_ea"."ea_ew_in" WHERE epr='VP3737RS' LIMIT 1 ).Error: Could not connect to database (Cannot access the database: Unable to connect to PostgreSQL server: connection to server at "10.106.0.2", port 5432 failed: FATAL: the database system is in recovery mode).Error: Could not connect to database (Cannot access the database: Unable to connect to PostgreSQL server: connection to server at "10.106.0.2", port 5432 failed: FATAL: the database system is in recovery mode).
Waste Tonnage, By Origin
The table shows a list of the Waste for the Permit VP3737RS, that has arrived into sites as reported to the Regulator and then publicised in their reported statistics. The Data used is from the most recent returns. The total reported tonnage arriving at the site was: Expression error: Unexpected < operator.t.
Where this tonnage exceeds that reported in year of the corresponding annual report, this may be due to the following reasons:
- Tonnage may have been received but not incinerated, i.e. the material is held pending incineration (the operator return to the EA reports as received whereas the annual report focuses on when the waste is incinerated.)
- Material may have been received into the site but treated in some other way than incineration.
- Material may have been received on the but transferred out of site for disposal/treatment at another site rather than incineration on the site.
EWC Code | Origin of Waste | Tonnes In |
---|
References
- ↑ Holbrook Energy Centre Site PhotoAll Rights Reserved
- ↑ 2.0 2.1 2.2 Date, 2017. Mid UK Supplies Waste Wood For Sheffield Biomass Facility. Online. letsrecycle.com. [Accessed 14 April 2020.]
- ↑ Kandor Energy, 2020. Kantor Energy - Holbrook Community Renewable Energy Centre. Online. Kantorenergy.com. [Accessed 14 April 2020.]
- ↑ Recycling and Waste World, 2017. Sheffield Renewable Energy Centre Opts For Biomass Wood Chip From Mid UK Recycling. Online Recyclingwasteworld.co.uk. [Accessed 14 April 2020.]
- ↑ In the case of EfW plants with gasification technology the figures are reported in terms of cubic metres of syngas produced rather than tonnes used
- ↑ Biomass Sustainability Dataset 2020-21