Widnes Biomass Facility

Revision as of 09:11, 15 August 2022 by Bin52 (talk | contribs)


Widnes Biomass Facility
Operational
Site Location
Site Location

See Biomass EfW → page for a larger UK Wide map.

Operator Burmeister & Wain Scandinavian Contractor (BWSC)
Capacity 22.8 MWe
Feedstock Waste Wood
EPR (Waste Licence) JP3132RV
ROC Yes
CfD
CHP Yes

Operators Annual Report


Input Data

Year Wood Litter RDF Other Total
2017 19605 0 0 0 19605
2018 88077 0 0 0 88077
2019 129174 0 0 0 129174
2020 124624 0 0 0 124624
2021 143124 0 0 0 143124
2022 132199 0 0 0 132199


Output Data

Year IBA IBA %ge of Tot IN APC APC %ge of Tot IN
2017 664 3.39% 90 0.46%
2018 3529 4.01% 1668 1.89%
2019 4898 3.79% 2709 2.10%
2020 6466 5.19% 2864 2.30%
2021 8990 6.28% 3590 2.51%
2022 7637 5.78% 2978 2.25%


Summary

to add

Plant

to add

Annual Sustainability Tonnage Input/Fuel

The tonnage[1] received by the plant in the most recent Annual Sustainability Report and for the previous 3 years for 2020/21 was reported by Ofgem as below[2]:

Year Waste Wood (m3) Waste Wood (t) Straw Miscanthus Arboricultrual Waste Sawmill Residue Foresrty Residue Round Wood Short Rotation Coppice MBM Other Material
2020/21 0 113342 0 0 0 0 0 0 0 0 0
2019/20 0 150525 0 0 0 0 0 0 0 0 0
2018/19 0 63147 0 0 0 0 0 0 0 0 0
2017/18 0 0 0 0 0 0 0 0 0 0 0

Waste Tonnage, By Origin

The table shows a list of the Waste for the Permit JP3132RV, that has arrived into sites as reported to the Regulator and then publicised in their reported statistics. The Data was last updated on Oct-24. The total reported tonnage arriving at the site was: 132,666.93t.

Where this tonnage exceeds that reported in year of the corresponding annual report, this may be due to the following reasons:

  • Tonnage may have been received but not incinerated, i.e. the material is held pending incineration (the operator return to the EA reports as received whereas the annual report focuses on when the waste is incinerated.)
  • Material may have been received into the site but treated in some other way than incineration.
  • Material may have been received on the but transferred out of site for disposal/treatment at another site rather than incineration on the site.
EWC Code Origin of Waste Tonnes In
19 12 07 Halton 132666.93


References

  1. In the case of EfW plants with gasification technology the figures are reported in terms of cubic metres of syngas produced rather than tonnes used
  2. Biomass Sustainability Dataset 2020-21