Boston Energy Production Facility
Under Construction
Site Location
Site Location

See Biomass EfW → page for a larger UK Wide map.

Operator Biomass UK No3
Capacity 11.7 MWe
Feedstock Waste Wood/RDF
EPR (Waste Licence) UP3131DF
ROC
CfD
CHP Unkwn

Operators Annual Report


Input Data

Year Wood Litter RDF Other Total
2019 8772 0 0 0 8772
2020 6897 0 1147 0 8044
2021 60 0 0 0 60
2022 10145 0 11814 0 21959


Output Data

Year IBA IBA %ge of Tot IN APC APC %ge of Tot IN
2019 66 0.75% 149 1.70%
2020 483 6.00% 224 2.78%
2022 1189 5.41% 1077 4.90%


Summary

to add

Plant

to add

Annual Sustainability Tonnage Input/Fuel

The tonnage[1] received by the plant in the most recent Annual Sustainability Report and for the previous 3 years for 2020/21 was reported by Ofgem as below[2]:

Year Waste Wood (m3) Waste Wood (t) Straw Miscanthus Arboricultrual Waste Sawmill Residue Foresrty Residue Round Wood Short Rotation Coppice MBM Other Material
2020/21 0 0 0 0 0 0 0 0 0 0 0
2019/20 0 0 0 0 0 0 0 0 0 0 0
2018/19 0 0 0 0 0 0 0 0 0 0 0

The query SELECT "updated" FROM "db_ea"."ea_ew_in" WHERE epr='UP3131DF' LIMIT 1 is invalid (Error : SSL SYSCALL error: EOF detected

Function: EDConnectorRdbms::fetch Query: SELECT "updated" FROM "db_ea"."ea_ew_in" WHERE epr='UP3131DF' LIMIT 1 ).Error: Could not connect to database (Cannot access the database: Unable to connect to PostgreSQL server: connection to server at "10.106.0.2", port 5432 failed: FATAL: the database system is in recovery mode).Error: Could not connect to database (Cannot access the database: Unable to connect to PostgreSQL server: connection to server at "10.106.0.2", port 5432 failed: FATAL: the database system is in recovery mode).

Waste Tonnage, By Origin

The table shows a list of the Waste for the Permit UP3131DF, that has arrived into sites as reported to the Regulator and then publicised in their reported statistics. The Data used is from the most recent returns. The total reported tonnage arriving at the site was: Expression error: Unexpected < operator.t.

Where this tonnage exceeds that reported in year of the corresponding annual report, this may be due to the following reasons:

  • Tonnage may have been received but not incinerated, i.e. the material is held pending incineration (the operator return to the EA reports as received whereas the annual report focuses on when the waste is incinerated.)
  • Material may have been received into the site but treated in some other way than incineration.
  • Material may have been received on the but transferred out of site for disposal/treatment at another site rather than incineration on the site.
EWC Code Origin of Waste Tonnes In


References

  1. In the case of EfW plants with gasification technology the figures are reported in terms of cubic metres of syngas produced rather than tonnes used
  2. Biomass Sustainability Dataset 2020-21