Leeds Recycling & ERF (Cross Green ERF)
| Leeds Recycling & ERF (Cross Green ERF) Operational | |
See Residual EfW → page for a larger UK Wide map. | |
| Waste Licence | GP3334CX |
| Operator | Veolia |
| Region | Yorkshire and the Humber |
| Operational Capacity | 190ktpa |
| Is site R1? | fal |
| When was R1 Granted? | 2013-06-10 |
| What was the R1 value | 0.77 |
| Electrical Capacity | 15.00MWe |
| Number of Lines | 1 |
| Number of Turbines | 1 |
| CHP | Yes |
| Technology Approach | EfW |
| Funding Type | PFI |
Operators Annual Report
Input Data
| Year | HH | C&I | Clin | RDF | Total |
|---|---|---|---|---|---|
| 2016 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 |
| 2017 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 |
| 2018 | 168866.00 | 19626.00 | 273.00 | 0.00 | 188765.00 |
| 2019 | 166501.00 | 20605.00 | 993.00 | 0.00 | 190501.00 |
| 2020 | 187220.00 | 13823.00 | 1076.00 | 0.00 | 202119.00 |
| 2021 | 186709.00 | 12280.00 | 1214.00 | 0.00 | 200203.00 |
| 2022 | 187990.00 | 5282.00 | 1363.00 | 2739.00 | 197374.00 |
| 2023 | 172575.00 | 16194.00 | 1432.00 | 6048.00 | 196249.00 |
Output Data
| Year | IBA | IBA %ge of Tot IN | APC | APC %ge of Tot IN |
|---|---|---|---|---|
| 2016 | 36463.00 | 0.00% | 3282.70 | 0.00% |
| 2017 | 36770.00 | 0.00% | 3832.00 | 0.00% |
| 2018 | 38146.00 | 20.21% | 3529.00 | 1.87% |
| 2019 | 35861.00 | 18.82% | 4311.00 | 2.26% |
| 2020 | 39814.00 | 19.70% | 4335.00 | 2.14% |
| 2021 | 37228.00 | 18.60% | 4275.00 | 2.14% |
| 2022 | 35830.00 | 18.15% | 4214.00 | 2.14% |
| 2023 | 35994.00 | 18.34% | 4388.00 | 2.24% |