An EfW facility based upon conventional combustion technology and considered an ERF based on its R1 status. Marchwood ERF, also known as Integra South West, is located in Hampshire and has a permitted operational capacity of 180,000 tonnes per annum, exporting up to 16 MW electricity to the grid after the plants own power needs are supplied for. The plant is owned and operated by Veolia. The waste feedstock utilised at the plant is primarily residual waste arising from local households and businesses, and Local Authority services[1].


Marchwood ERF (Integra South West)
Operational
Site Location
Site Location

See Residual EfW → page for a larger UK Wide map.

Waste Licence BJ7093IY
Operator Veolia
Region South East
Operational Capacity 220ktpa
Is site R1? Yes
When was R1 Granted? 2015-09-30
What was the R1 value 0.67
Electrical Capacity 17.00MWe
Number of Lines 2
Number of Turbines 1
CHP No
Technology Approach EfW Incineration
Funding Type PPP

Operators Annual Report


Input Data

Year HH C&I Clin RDF Total
2016 143693.00 60360.00 0.00 0.00 204053.00
2017 196909.00 4872.00 0.00 0.00 201781.00
2018 181262.00 18223.00 0.00 0.00 199485.00
2019 188409.00 22794.00 0.00 0.00 211203.00
2020 186200.00 18266.00 0.00 0.00 204466.00
2021 181664.00 26322.00 1280.00 0.00 209266.00
2022 169998.00 30306.00 300.00 0.00 200604.00


Output Data

Year IBA IBA %ge of Tot IN APC APC %ge of Tot IN
2016 38331.36 18.79% 4931.96 2.42%
2017 37489.00 18.58% 5318.00 2.64%
2018 36655.00 18.37% 5440.00 2.73%
2019 37479.00 17.75% 5715.00 2.71%
2020 36569.00 17.89% 5178.00 2.53%
2021 35230.00 16.84% 5149.00 2.46%
2022 33489.00 16.69% 4929.00 2.46%

Marchwood ERF. Veolia, 2020.
Marchwood ERF. Veolia, 2020.


Summary

An EfW facility based upon conventional combustion technology and considered an ERF based on its R1 status. Marchwood ERF, also known as Integra South West, is located in Hampshire and has a permitted operational capacity of 180,000 tonnes per annum, exporting up to 16 MW electricity to the grid after the plants own power needs are supplied for. The plant is owned and operated by Veolia. The waste feedstock utilised at the plant is primarily residual waste arising from local households and businesses, and Local Authority services[1].

History

This facility was developed under a 28 year contract with Hampshire County Council, Southampton City Council and Portsmouth City Council (together forming Integra South West), signed in 1995 to provide waste disposal for 14 local and unitary authorities, with planning approval for the project granted in 2001. The EfW became operational in December 2004[1].

Plant

The design of this EfW was created in consultation with local residents, councils and a team of architects. The plant has a unique design, with the entire facility housed under an aluminium-cladded dome. Additionally, it does not have a cooling tower. Instead The ERF uses the estuary water as part of the cooling process not only to lower the temperatures on the boilers and the generator, but also for the steam which is used to power the turbines that generate the electricity[2].

The combustion technology is the Martin GmbH reverse acting grate with a two lines[3]. The EPC contractor to build the plant was CNIM, CNIM also supplied the semi-dry lime scrubber for treatment of the flue gas which is followed by high performance bag filters, discharging into a 65 metre high chimney[4].

Project Integra is a unique partnership between Hampshire County Council, the two Unitary Authorities of Southampton and Portsmouth, the 11 District Councils and Veolia Environmental Services.

Local Authority Data

The table below lists those local authorities who have recorded their tonnage on WasteDataFlow as sending their Waste to this site (either directly or via a transfer station) for the most recent financial year, data was updated on 2023-04-26. The tonnage received cannot be directly compared with the stated historical tonnage received and recorded in the EA statistics as these are recorded on a calendar year basis (i.e. January 2018 to December 2018). The total Local Authority waste received by the plant in the period was: 188,257.96t

A 'zero return' or a below expected return, when compared to the EA Data below indicates that either:

  • no local authority tonnage was recorded/no tonnage was sent to the site in the period (but has been listed as it may have previously received tonnage from a local authority) or
  • a result of the plant being recently commissioned and actually having received no tonnage or
  • a lower than expected tonnage maybe a result of a local authority splitting their tonnage over multiple sites, having less tonnage to send than might be anticipated or
  • it may be a new plant being in 'ramp up' towards full capacity after construction or
  • may be a result of plant shut down and subsequent re-start in a year or
  • the local authority may not have correctly entered the site's details on WasteDataFlow


Authority Tonnage
Bournemouth, Christchurch and Poole Council 2962.200
Dorset Council 2648.440
Hampshire County Council 123165.030
Southampton City Council 54072.910
West Berkshire District Council 5409.380

Waste Tonnage, By Origin

The table shows a list of the Waste for the Permit BJ7093IY, that has arrived into sites as reported to the Regulator and then publicised in their reported statistics. The Data was last updated on October 2023. The total reported tonnage arriving at the site was: 200,386.68t. Where this tonnage exceeds that reported in year of the corresponding annual report, this may be due to the following reasons:

  • Tonnage may have been received but not incinerated, i.e. the material is held pending incineration (the operator return to the EA reports as received whereas the annual report focuses on when the waste is incinerated.)
  • Material may have been received into the site but treated in some other way than incineration.
  • Material may have been received on the but transferred out of site for disposal/treatment at another site rather than incineration on the site.
EWC Code Origin of Waste Tonnes In
20 03 01 South East 24.74
20 03 01 Wakefield 64.70
20 03 01 Rushmoor 2678.34
20 03 01 Bristol 793.40
20 03 01 Portsmouth 2060.23
19 12 12 East Hampshire 124.16
20 03 01 Havant 4.88
20 03 01 Fareham 26.60
20 03 03 Hampshire 39.78
20 03 01 Southampton 35329.58
20 03 01 Dartford 155.40
20 03 03 New Forest 312.44
19 12 12 Bournemouth, Christchurch and Poole 250.80
20 03 01 New Forest 28166.16
20 03 01 Herefordshire 408.06
20 03 03 Southampton 214.70
19 12 12 New Forest 93.36
19 12 12 Bristol 964.38
18 01 04 Portsmouth 307.28
20 03 01 East Hampshire 9689.12
20 03 01 Eastleigh 267.18
20 03 01 Hampshire 66358.05
20 03 01 Cardiff 450.66
20 03 01 Dorset 3989.38
19 12 12 Dorset 2663.66
19 12 12 Somerset 4199.58
20 01 39 Hampshire 11.68
18 01 07 Portsmouth 0.72
20 03 07 Southampton 23.60
20 01 39 Basingstoke and Deane 3.40
02 02 04 New Forest 0.56
19 12 12 South East 2111.88
20 03 07 Portsmouth 125.79
20 03 01 Test Valley 4411.46
20 01 99 Portsmouth 0.84
19 12 12 Fareham 2918.18
20 03 01 Winchester 12341.40
20 03 01 Bournemouth, Christchurch and Poole 6867.06
20 01 11 Hampshire 5.96
19 12 12 West Berkshire 9046.46
20 02 01 Peterborough 1.24
02 03 04 New Forest 0.30
20 03 01 Basingstoke and Deane 7.62
19 12 10 Portsmouth 35.54
20 03 01 West Berkshire 1275.32
20 01 08 Hampshire 642.58
20 01 08 Southampton 918.47