EnviRecover - Hartlebury EFW: Difference between revisions

Arctellion (talk | contribs)
No edit summary
Arctellion (talk | contribs)
No edit summary
 
(4 intermediate revisions by 3 users not shown)
Line 1: Line 1:
[[File:Mercia Hartlebury.png|400px|left|Mercia Hartlebury]]
{{#vardefine:epr|XP3935TX}}[[Category:EfW Plants]]
[[Category:EfW Plants]][[Category:Tonnage & Waste Types]][[Category:Technologies & Solutions]]
An [[EfW]] facility based upon conventional combustion technology and considered an [[ERF]] based on its [[R1]] status. The EnviRecover site, often known as Hartlebury, has permitted operational capacity of 230,000 tonnes per annum, and is operated by [[Severn Waste Services]] and sister company [[Mercia Waste Management Ltd]], both of which are jointly owned by [[FCC Environment]] and [[Urbaser]] in a partnership with [[Herefordshire Council| Herefordshire]] and [[Worcestershire County Council|Worcestershire]]. Delivery of waste is by road and the facility processes primarily residual [[Household Waste]] and some [[Commercial Waste]]<ref>[http://www.fccenvironment.co.uk/green-energy/envirecover/ FCC Environment Website]</ref>.
{{EfWTemplate|EPR=XP3935TX|id=26}}


{{EfWTemplate|EPR={{#var:epr}}|id=26}}[[File:Mercia Hartlebury.png|400px|left|Mercia Hartlebury]]__TOC__<br clear='left' />
==Summary==
==Summary==
An [[EfW]] facility based upon conventional combustion technology and considered an [[ERF]] based on its [[R1]] status. The EnviRecover site, often known as Hartlebury, has permitted operational capacity of 230,000 tonnes per annum, and is operated by [[Severn Waste Services]] and sister company [[Mercia Waste Management Ltd]], both of which are jointly owned by [[FCC Environment]] and [[Urbaser]] in a partnership with [[Herefordshire Council| Herefordshire]] and [[Worcestershire County Council|Worcestershire]]. Delivery of waste is by road and the facility processes primarily residual [[Household Waste]] and some [[Commercial Waste]]<ref>[http://www.fccenvironment.co.uk/green-energy/envirecover/ FCC Environment Website]</ref>.  
An [[EfW]] facility based upon conventional combustion technology and considered an [[ERF]] based on its [[R1]] status. The EnviRecover site, often known as Hartlebury, has permitted operational capacity of 230,000 tonnes per annum, and is operated by [[Severn Waste Services]] and sister company [[Mercia Waste Management Ltd]], both of which are jointly owned by [[FCC Environment]] and [[Urbaser]] in a partnership with [[Herefordshire Council| Herefordshire]] and [[Worcestershire County Council|Worcestershire]]. Delivery of waste is by road and the facility processes primarily residual [[Household Waste]] and some [[Commercial Waste]]<ref>[http://www.fccenvironment.co.uk/green-energy/envirecover/ FCC Environment Website]</ref>.  
Line 10: Line 10:


==Plant==
==Plant==
Built by [[Hitachi Zosen Inova]] under a Design & Build [[EPC]]-turnkey contract . Construction was completed in 2017 at a reported<ref>[http://www.hz-inova.com/cms/wp-content/uploads/2015/08/H_W_online_E.pdf Hitachi Zosen Inova Website]</ref> GBP £125m capital cost but also reported at £165m<ref>[https://www.letsrecycle.com/news/latest-news/envirecover-efw-facility-completed/ Letsrecycle Article]</ref>.
Built by [[Hitachi Zosen Inova]] under a Design & Build [[EPC]]-turnkey contract . Construction was completed in 2017 at a reported<ref>[https://www.hz-inova.com/projects/herefordshire-worcestershire-uk/ Hitachi Zosen Inova Website]</ref> GBP £125m capital cost but also reported at £165m<ref>[https://www.letsrecycle.com/news/latest-news/envirecover-efw-facility-completed/ Letsrecycle Article]</ref>.
The plant comprises 1 line of 26 tonnes/hour (maximum 30.5 tonnes/hour) with a design capacity capable of treating 200,000 tonnes per annum via standard combustion technology, air cooled, Hitachi Zosen Inova Grate, generating super-heated steam, and is configured to run on residual [[Household Waste]] and [[Commercial Waste]] with a [[CV]] of between 6.8 and 12.0 MJ/kg delivering 18 MWe of power.
The plant comprises 1 line of 26 tonnes/hour (maximum 30.5 tonnes/hour) with a design capacity capable of treating 200,000 tonnes per annum via standard combustion technology, air cooled, Hitachi Zosen Inova Grate, generating super-heated steam, and is configured to run on residual [[Household Waste]] and [[Commercial Waste]] with a [[CV]] of between 6.8 and 12.0 MJ/kg delivering 18 MWe of power.


==Local Authority Users==
{{EfWLAData|EPR={{#var: epr}}}}
The following data comes from [[WasteDataFlow]] for the financial year 2018/19 and represents those local authorities recorded as putting tonnage into the site (either directly or via a transfer station). The tonnage received cannot be directly compared with the stated historical tonnage received and recorded in the [[EA]] statistics as these are recorded on a calendar year basis (i.e. January 2018 to December 2018). A 'zero return' below indicates no local authority tonnage was recorded, most likely a result of the plant being recently commissioned and actually having received no tonnage. Equally, lower than expected tonnage maybe a result of either a new plant being in 'ramp up' towards full capacity after construction, or may be a result of plant shut down and subsequent re-start in a year.
{{EAIn|EPR={{#var: epr}}}}
{{#clear_external_data:}}
 
{{#get_db_data: db=engy
|from=wdfincin|where=epr='XP3935TX'|data=authority=authority,epr=epr,ton=ton}}
{|class="wikitable sortable"
! Authority
! Tonnage {{#for_external_table:<nowiki/>
{{!}}-
{{!}} [[{{{authority}}}]]
{{!}} {{{ton}}}
}}
|}
==References==
==References==
<references />
<references />