East Midlands Energy Re-Generation Centre (EMERGE): Difference between revisions
add page specific text |
m minor text change |
||
| Line 11: | Line 11: | ||
==Technology== | ==Technology== | ||
The moving-[[grate]] [[combustion]] technology is not defined as yet in the public domain or in the [[Environmental Permit]] application. The design set out in the [[Environmental Permit]] decision notice is based upon 7,884 hours per year of operation at a nominal 33 tonnes per line (equating to 2 lines) with a [[R1]] rating of 0.76 (classifying it as [[Recovery]] facility). | The moving-[[grate]] [[combustion]] technology is not defined as yet in the public domain or in the [[Environmental Permit]] application. The design set out in the [[Environmental Permit]] draft decision notice is based upon 7,884 hours per year of operation at a nominal 33 tonnes per line (equating to 2 lines) with a [[R1]] rating of 0.76 (classifying it as [[Recovery]] facility). | ||
==Construction== | ==Construction== | ||