Ferrybridge Multifuel 2 (FM2): Difference between revisions

Arctellion (talk | contribs)
No edit summary
BabarKing (talk | contribs)
No edit summary
 
Line 7: Line 7:


==History==
==History==
The Ferrybridge FM2 facility was built to service primarily residual [[Household Waste]], [[Commercial Waste]], [[RDF]], [[SRF]] and [[Wood Waste]] giving it flexibility in the market and responding to the success and demand for the FM1 plant. The core tonnage for the plant has come from a range of suppliers, including [[RDF]] from [[AWM]]'s [[Treatment]] facility in Leeds (which receives tonnage from [[Bradford Metropolitan District Council | Bradford]] amongst others) but the plant also includes a large proportion of tonnage from other waste management companies processing [[Residual Waste]] to form an [[RDF]] for the plant, rather than relying on a core [[PPP]] or [[PFI]] contract for supply. It is located on the old Ferrybridge 'C' coal fire power station near Knottingley and has [[Ferrybridge Multifuel 1 (FM1)]] located adjacent to it, on the same [[SSE]] site. The combined FM1 and FM2 are capable of processing 1,350,000 tonnes per annum, making it the biggest [[Residual Waste EFW]] site in the UK.
The Ferrybridge FM2 facility was built to service primarily residual [[Household Waste]], [[Commercial Waste]], [[RDF]], [[SRF]] and [[Wood Waste]] giving it flexibility in the market and responding to the success and demand for the FM1 plant. The core tonnage for the plant has come from a range of suppliers, including [[RDF]] from [[Associated Waste Management]]'s [[Treatment]] facility in Leeds (which receives tonnage from [[Bradford Metropolitan District Council | Bradford]] amongst others) but the plant also includes a large proportion of tonnage from other waste management companies processing [[Residual Waste]] to form an [[RDF]] for the plant, rather than relying on a core [[PPP]] or [[PFI]] contract for supply. It is located on the old Ferrybridge 'C' coal fire power station near Knottingley and has [[Ferrybridge Multifuel 1 (FM1)]] located adjacent to it, on the same [[SSE]] site. The combined FM1 and FM2 are capable of processing 1,350,000 tonnes per annum, making it the biggest [[Residual Waste EFW]] site in the UK.


The project was originally a 50:50 joint venture between [[Wheelabrator]] and [[SSE]], but in late  2020 [[SSE]] sold their share to the [[European Diversified Infrastructure Fund III]], a fund managed by [[First Sentier Investors]] (FSI) (formally known as First State Investments) headquartered in Australia. In December 2020 [[Wheelabrator]] announced the sale of their UK energy from waste division to the same fund<ref>https://www.letsrecycle.com/news/latest-news/wheelabrator-to-sell-uk-efw-arm/</ref> for completion in early 2021.  
The project was originally a 50:50 joint venture between [[Wheelabrator]] and [[SSE]], but in late  2020 [[SSE]] sold their share to the [[European Diversified Infrastructure Fund III]], a fund managed by [[First Sentier Investors]] (FSI) (formally known as First State Investments) headquartered in Australia. In December 2020 [[Wheelabrator]] announced the sale of their UK energy from waste division to the same fund<ref>https://www.letsrecycle.com/news/latest-news/wheelabrator-to-sell-uk-efw-arm/</ref> for completion in early 2021.